6
Update process
Note: For some configurations the PC box is sealed or there is no Update connector on the PC
box because it is not allowed to perform an Update.
During the Update process the PC box must be connected to the cable harness because the
initialisation process will determine the type of machine by cable detection and perform the right
initialisation.
If you get a new Update from TAB with new games or you have to update the machine because
of a defect hard disk drive please perform the following:
•
Switch off the PC (switch off the power supply) or the whole machine
•
Turn down the PC box so you have access to the Update disk connector located outside on
the top of the PC
•
Insert the Update disk into the connector
•
Switch on the PC
•
The Update process will start automatically. It is finished when you see the message: „UP-
DATE FINISHED - Please switch off, remove Update disk and switch on again“.
Please perform in that way.
•
After switching on again the installation process will perform until the message „please
calibrate touch screen“ will appear.
•
Please perform the 4 point touch screen calibration in any way because some initial data
will be stored on the hard disc.
After the initialisation process the „enhanced write filter“ will be activated and it is no longer
possible to perform this initial touch screen calibration.
•
The machine will boot up into normal game mode or
•
The message „Secure Memory Error!“ will appear if you have changed the dongle or in-
stalled a new version of Golden Island Software.
In this case please perform a Factory reset (see chapter 9.8, page 24) and proceed with
the Configuration settings menu (see chapter 9, page 17)
•
Factory Reset: Enter the Configuration settings menu by turning on the Configuration set-
tings switch which is located inside the Logic box
On the screen press the button „Perform Factory reset“
All configuration settings will be reset to their default values and all accounting data, statistic
data and event logs will be cleared! The machine will boot up once more and afterwards
you can setup the configuration setting:
Page: 13
Summary of Contents for Golden Island Nevada
Page 1: ......
Page 2: ......
Page 8: ......
Page 20: ...This dialog prompts you to insert or remove an USB stick at the PC Page 12...
Page 50: ...18 JCM UBA 10 SS Bill Acceptor maintenance Page 42...
Page 52: ...Page 44...
Page 63: ...24 Declaration of CE conformity Page 55...
Page 71: ...27 Notes Nevada LT EN Page 63...