TA ENGINEERING PM-30E Operating Instructions Manual Download Page 5

POWER METER PM-30E

TA ENGINEERING e.K. - GERMANY

5

Long-term memory

The long term big module memory gives the user the ability to select up to three different mean
demand measurement values synchronously. This is integrated with the RTC into 5, 10 or 15
minutes time for a week interminably. The stored data can at the arbitrary time be downloaded from
the PM-30E to the PC and then can be distributed on spread sheets and the curves can be plotted.
For example the user can get the load profile [kW] of a consumer/plant in week view or he can
analyze the data over a chosen interval of time..

!

Communication Network Port

The PM-30E is equipped with PC bus (RS422/RS485) serial interface with one default. PC bus
interface knows about these up to the 250 PM-30E equipment in a bus network being connected to
a Network / connected each other. The communication becomes with the software program
PM-30NET steered by a PC. Two different ways of communication are at the user's disposal:

The bus network (Max. 1000 m of length get this) directly about an interface converter Obliged to
PC (external serial RS232 interface).

The bus network (Max. 1000 m of length become) directly about an interface converter with one
obliged to an external modem. The communication (between the PC and PM-30E) becomes about
this one Telephone lines built up. The user of a remote place can the plants so supervising the
software program PM30Net and evaluating. A PM-30E device must when here. Master being
adjusted for the modem communication in the set-up menu.PM-30E adress
About the membrane keyboard the user in the set-up menu who adjusts equipment address
(1,,250) must.

About the membrane keyboard the user in the set-up menu who adjusts equipment address
(1,,250) must

Direct connection

Modem connection

PM-30E adress

!

To avoid communication faults must in a bus network of every PM-30E
Equipment with a different address being addressed.

Connection

Connecting equipment (X5 RJ socket) with the bus network with connection line the PM-30E.

-15 minutes : Three measurandsdiagram
-10 minutes : Two measurandsdiagram
-5 minutes : A measurandsdiagram

Summary of Contents for PM-30E

Page 1: ...Operating instructions PM 30E POWER METER ENGINEERING TA ENGINEERING e K GERMANY...

Page 2: ...4 3 3 4 4 4 4 4 5 4 4 6 6 5 6 Table Measurement Parameters Setup Menue Table Setup Setting Parameter Main Voltage Show Measurement Parameters Current Frequency Power Factor Active Power Reactive Powe...

Page 3: ...Menue Button NEXT Button Up Button down Button voltage Button current Button Frequency Button Power Faktor Button Max and Min parameter Button Active Power Button Reactive Power Button Apparent Power...

Page 4: ...wer generation sub stations and energy management The PM 30E is housed in a switchboard case according to DIN 43700 with a compact size 144 x144x75 mm Its shallow depth of 75mm inclusive of terminals...

Page 5: ...e at the user s disposal The bus network Max 1000 m of length get this directly about an interface converter Obliged to PC external serial RS232 interface The bus network Max 1000 m of length become d...

Page 6: ...CT wires to X2 terminal When terminating auxiliary voltage wires and earth to X3 terminal When switching the auxiliary voltage L N ON During setup of the parameters q q q q q q These are 4 terminals f...

Page 7: ...e Energy import Active Energy export Reactive Energy import Reactive Energy export Apparent Energy import Apparent Energy export Rotation L1 L2 L3 Current Phase L1 Voltage Phase L3 L1 Voltage Phase L2...

Page 8: ...ime Reset Min Max Parameter SETUP MAIN Info Symbol Revision ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET ENTER RESET Language German English VT Parameter primary...

Page 9: ...Reserved ENTER RESET Service Reserved Time Date change time ENTER RESET ENTER RESET change date ENTER RESET ENTER RESET ENTER RESET Info PC BUS ENTER RESET PC BUS PM 30E Address Modem Master ENTER RE...

Page 10: ...Voltage L N U1N U2N U3N Voltage L L U12 U23 U31 Rotation L1 L2 L3 U U U Current I1 I2 I3 Frequency F I PF F P Q S Power Factor PF Active Power P1 P2 P3 Power 3 phase P Q S Reactive Power Q1 Q2 Q3 App...

Page 11: ...K GERMANY Demand Parameters D flashing Demand Parameter in the meantime D Demand Parameter in the last Cycle xxxxxxx U I P PF xxxxxxx U I P PF D D D D D flashing xxxxxxx U I P PF Demand Parameter in t...

Page 12: ...n U2N Min U3N Min Current Peak I1 Min I2 Min I3 Min Current Peak I1 Max I2 Max I3 Max Voltage U1N Max U2N Max U3N Max Voltage U1N Min U2N Min U3N Min Current I1 Min I2 Min I3 Min D D D Current I1 Max...

Page 13: ...ve Power Q1 Min Q2 Min Q3 Min Apparent Power S1 Max S2 Max S3 Max Apparent Power S1 Min S2 Min S3 Min Active Power P Max P Min D Reactive Power Q Max Q Min D POWER METER PM 30E TA ENGINEERING e K GERM...

Page 14: ...MAX SETUP ENTER MAIN RESET D min 3 1 2 4 G 3 1 2 4 G 1 2 3 4 PM 30E Power Meter I U PF W F P S Q MAX SETUP ENTER MAIN RESET D min SHIELD X2 BK 2M X2 BK 2M PM 30E Device Address 1 BC 1 IN 1 RA BUS Con...

Page 15: ...PF W F P S Q MAX SETUP ENTER MAIN RESET D min 3 1 2 4 G 3 1 2 4 G 1 2 3 4 PM 30E Power Meter I U PF W F P S Q MAX SETUP ENTER MAIN RESET D min SHIELD X2 BK 2M X2 BK 2M PM 30E Device Address 1 BC 1 IN...

Page 16: ...it Diagram 1 4 Wire Circuit Diagram 2 3 Wire L1 L2 L3 k l k k l l L N 1A 1A 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L1 L2 L3 N k l k k l l L N 1A 1A 1A T0 315A L1 L2 L3 N...

Page 17: ...l k k l l L N T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 1A 1A 1A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 TA ENGINEERING e K GERMANY 17 Circuit Diagram 3 4...

Page 18: ...uit Diagram 5 4 Wire 2xCTs Circuit Diagram 6 3 Wire 2xCTs L1 L2 L3 N k l k l L N 1A 1A 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L1 L2 L3 L N 1A 1A 1A T0 315A k l k l L1 L2...

Page 19: ...Y Circuit Diagram 7 Single phase Circuit Diagram 8 Single phase VT L N k l L N 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32 L PE N PM 30E PM 30S X1 X2 X3 L N k l L N 1A T0 315A L1 L2 L3 N 11 21 31 12 22 32...

Page 20: ...tage Sensing Inputs X2 Currents Sensing Inputs Humidity 0 300V AC L N 20 0 5A AC Voltage 0 03VA Current 3VA 90 260V AC 5 VA 50 60 Hz 100 138000V 100 300V 5 10000A 5A or 1A 0 5 5 Digit 0 5 5 Digit 1 0...

Page 21: ...RING e K Germany BC 1 IN 1 IN 2 BK 2M BK 4M BUS Connector Comunication Interface BUS PC BUS cable 2m length connect PM 30E with BUS Connector BK 6M PM30Net Kommunikation und Analyse Software PM30Net S...

Page 22: ...inger Strasse 39 D 71111 Waldenbuch Germany Phone TA ENGINEERING e K ENGINEERING 49 7157 530 984 Telefax 49 7157 530 986 E mail info ta engineering de http www ta engineering de 05 02 All Rights Reser...

Reviews: