T-Link-EV5273/5276/5250 User Manual
UM-T-Link-EV5273_5276_5250
_E
18
Rev 0.90, 2016/11/07
5.
How to use four wires to program or simulate by T-Link Board
The T-Link ICE Board can use four wires (VCC, VSS, P3.0/P2.4, P3.1/P2.5) or five wires (VCC, VSS,
P3.0/P2.4, P3.1/P2.5, P3.3) to program, user must to select 4-wire in “Utilities dialog box settings”.
5.1
Utilities dialog box settings: Click on “Option” button, and select 4-Wire, as shown below.