3.2.3 Electrical data Topvex SR 09, 11, Topvex TR 09-15
Model
Fans (W tot)
400 V 3N~
Fans (W tot.)
230V 3~
El Heating
battery (kW
tot.)
Fuse (mains)
(A) for 400 V
3N~
Fuse (mains)
(A) for 230 V
3~
SR 09 EL
3754
3754
12
3x35
3x50
SR 09 (None,
HWL/HWH)
3754
3754
–
3x10
3x16
SR 11 EL
6130
6130
15
3x35
3x63
SR 11 (None,
HWL/HWH)
6130
6130
–
3x16
3x20
Model
Fans (W tot)
400 V 3N~
Fans (W tot.)
230V 3~
El Heating
battery (kW
tot.)
Fuse (mains)
(A) for 400 V
3N~
Fuse (mains)
(A) for 230 V
3~
TR 09 EL
3780
3780
9
3x25
3x40
TR 09 (None,
HWL/HWH)
3780
3780
–
3x10
3x10
TR 12 EL
3574
3574
12
3x35
3x50
TR 12 (None,
HWL/HWH)
3574
3574
–
3x10
3x16
TR 15 EL
6760
6760
15
3x35
3x63
TR 15 (None,
HWL/HWH)
6760
6760
–
3x16
3x20
3.3 Transport and Storage
The Topvex SR/TR should be stored and transported in such a way that it is protected against physical
damage that can harm panels, handles, display etc. It should be covered so that dust, rain and snow
cannot enter and damage the unit and its components. The appliance is delivered in one piece containing
all necessary components, wrapped in plastic on a pallet for easy transportation.
When transporting the Topvex SR/TR units use a forklift placed on the gable of the unit.
Warning
The unit is heavy. Be careful during transport and mounting. Risk of injury through pinching. Use
protective clothing.
4 Installation
4.1 Unpacking
Verify that all ordered equipment are delivered before starting the installation. Any discrepancies from the
ordered equipment must be reported to the supplier of Systemair products.
Topvex SR 09, 11, TR 09-15
Installation instructions
207577
5
Systemair AB