Pipe flushing should be performed once the brazed connections have been completed with the exception of
the final connections to the indoor units. That is, flushing should be performed once the outdoor unit have been
connected but before the indoor units are connected.
Vacuum drying
4
Pipe manipulation
5
razing
2
techniques
Gas tightness test
6
Summary of Contents for Mini C Series
Page 1: ......
Page 2: ...1 ...
Page 3: ...2 ...
Page 4: ...3 1 1 1 1 2 Capacity kW Model Name 8 12 1 ...
Page 5: ...4 2 2 1 2 2 ...
Page 6: ...5 3 3 1 ...
Page 7: ...6 3 2 ...
Page 9: ...8 5 5 1 1 ...
Page 10: ...9 5 2 Indoor ...
Page 14: ......
Page 16: ...15 wire x 0 75 wire x 0 75 Ambient temp Cooling 5 55 Heating 15 27 1 2 3 4 ...
Page 17: ...16 2 ...
Page 18: ...17 3 ...
Page 19: ...18 4 ...
Page 20: ...19 1 2 3 4 5 ...
Page 56: ...98 ...
Page 64: ...106 3 4 Figure 3 3 3 Selecting piping diameters 1 1 2 3 4 ...
Page 67: ...109 ...
Page 76: ...118 4 8 4 8 1 faults 4 8 2 ...
Page 77: ...119 4 8 3 4 9 4 9 1 1 2 3 4 a b c d ...
Page 86: ...128 box continued from previous page Pressure gauge ...
Page 90: ...132 8 4 ...
Page 94: ...136 11 ...
Page 98: ...140 Project name and location System name ...
Page 99: ......