14
| Cleaning
• complete overhaul of motors
• replacement of bearings
• re-winding of motors
• monitoring of condition
• vibration analysis
After 20,000 hours of operation or 5 years of normal operation
♦
Check the condition of the shaft sealing rings and shaft bearings and take action if necessary.
After 30,000 to 40,000 hours of operation
♦
The bearings must be replaced at the end of the grease service life (about 30,000 to 40,000 h in standard
applications).
Work before switching on again
♦
Attach all the safety and protective devices tightly and securely.
♦
Remove all the devices with which you have blocked the rotor.
♦
Remove all assembly residues and foreign bodies from the area around the fan unit.
12
Cleaning
Safety information
♦
Observe 2
Procedure
Keeping the fan clean extends its service life.
• Do not use steel brushes or sharp-edged objects.
• Do not use a high-pressure cleaner (steam jet cleaner) under any circumstances.
• Do not bend the fan blades when cleaning.
13
Deinstallation/dismantling
Deinstall and dismantle the fan in reverse order of installation and electrical connection.
14
Disposal
♦
Ensure material is recycled. Observe national regulations.
♦
The device and the transport packaging are predominantly made from recyclable raw materials.
♦
Disassemble the fan into its components.
♦
Separate the parts according to:
• reusable material
• material groups to be disposed of (metal, plastics, electrical parts, etc.)
218839 | 002