background image

Packing installation

line

DETAIL B 

Plastic door

Lock installation

NOTE: Install the lock only on the plastic door.

Equipos Profesionales de Comunicación S.A. de C.V

Calle Méndez y 20 # 2001, Colonia Pacifico,

Tel. (614) 4120126

C.P. 31030, Chihuahua, Chih, México

Read this user manual before installing the product

 and keep it for future reference.

User Manual

SR1928FV2

Cabinet with 19” Rack STD

Packing Installation(included) in 

front door view.

Front view

NOTE: The packing must be installed twice, but 

only on the side of the plastic door.

Reviews: