background image

0522 - Printed in Germany  

 

 

 

9.0245.04

Field of application

The BA-Filling-Combi type 6628 automatically fills and 

refills central heating installations. The integral BA back

-

flow preventer complying with the European Standard 

EN 1717 prevents the backflow of heating water into the 

potable water pipe. The device is permanently connec

-

ted to the heating installation as stipulated by EN 1717. 

The integral pressure reducing valve ensures correct 

and constant pressure in the installation. The BA-Filling-

Combi 6628 is particularly suited for compact connec

-

tion to the SYR Heating-Filter-Combi type 3315. 

The BA-Filling-Combi includes an isolating valve, a BA 

backflow preventer according to EN 1717, a tundish, test 

devices, a pressure reducing valve, a strainer and a pres

-

sure gauge. Setting range of the pressure reducing valve: 

between 0.5 and 4 bar. Threaded unions on both sides

Body made of DZR brass. Internal parts and tundish made 

of high quality synthetic material and NBR. 

Specifications

Connection size: 

 

3/4" IG

Nominal size:   

 

DN 15

Fluid:   

 

 

potable water

Max. operating pressure: 

10 bar

Min. inlet pressure: 

 

1.5 bar

Outlet pressure:  

 

0.5 - 4 bar

Factory setting:  

 

1.5 bar

Mounting position: 

 

horizontal, tundish

                                                 facing downwards

Max. inlet temperature:   

30°C

Max. outlet temperature: 

60°C

Tundish connection: 

 

DN 40

Filling capacity:  

 

max

 1.35 m³/h, 

 

 

 

 

p 1.5 bar

Function

The SYR BA-Filling -Combi includes all components re

-

quired for direct connection of the potable water pipe to 

the heating circuit, as stipulated by EN 1717. The integral 

pressure reducing valve ensures that the adjusted outlet 

pressure remains constant in order to protect the heating 

Installation

The connecting pipe of the SYR BA-Filling-Combi shall 

not allow any stagnation. Thoroughly flush the pipe prior 

to  installation  of  the  SYR  BA-Filling-Combi.  Install  the 

device in the pipe with the tundish facing downwards to 

allow correct drainage of the water. Free access to the 

device should be provided to simplify maintenance and 

inspection. It shall not be installed in locations liable to frost 

or flooding; ensure that the location is well ventilated. The 

drain device must be able to collect the drained volume. 

It is recommended to install a drinking water filter directly 

behind the water meter in order to ensure durable and 

perfect functionality of the valve. Observe the maintenance 

intervals of the BA-Filling-Combi. Follow the instructions 

of the European Standard EN 12056 for the connection 

of the tundish to the sewage system.

Maintenance of backflow preventer

Setting of pressure reducing valve

Maintenance 

As  EN  1717  prescribes  maintenance  works  on  the  BA 

backflow preventer on a regular basis, it is recommended 

to have service agreements between user and installer. 

The correct function of the valve has to be verified after 

one year and then periodically according to the operating 

conditions, but after one year at the latest. The connections 

for service valves available in each pressure zone allow 

to test the function of the valve with the corresponding 

pressure  gauge  (accessories;  service  kit  art.  number 

6600.00.902). The cartridge system of the backflow pre

-

venter allows simple and unproblematic maintenance. 

The pressure reducing valve of the BA-Filling-Combi is 

factory set to 1.5 bar. Verify functionality and clean on a 

regular basis, at least once per year. Adjust the pressure 

reducing valve as follows:

- ensure that the inlet pressure is at least 1 bar higher 

than the desired outlet pressure.

- loosen the screw (7).

  To  verify  the  primary  check  valve,  depressurise  the 

 

  valve and replace the manometer plugs (6) with service

 

  valves.  

 

  Connect the pressure gauge to the service valves.

  Open the service valves, pressurise the valve and close 

 

  the ball valve (4). 

  Reduce the inlet pressure by means of  the depressuri-

 

  sation plug (8). The differential pressure drops, so that 

 

  the  intermediate  pressure  zone  starts  to  open.  The 

 

  intermediate pressure zone must be fully open at the 

 

  latest when the differential pressure between upstream 

 

  and intermediate pressure zone has dropped to 140 

 

  mbar.

  Close the depressurisation plug (8). 

  Open the ball valve. The intermediate pressure zone has

 

  to close. The differential pressure between upstream 

 

  and intermediate pressure zone has to remain constant.

 

  Malfunction can result from impurities  or mechanical 

 

  defects.

  Remove the pressure gauge, assemble the manometer

 

  plug (6) and open the ball valve (4).

 

installation  against  undesired  overpressure  during  the 

filling operation. When the system is filled and vented, 

close the integral isolating valve to prevent uncontrolled 

re-filling of the heating installation.

Service valve

Upstream pr.  zone
Service valve

Interm. pr. zone
Pressure gauge
Ball valve

3

2

4

Drain valve

5

1

6

Manometer plug

7

Screw

Design

- turn the adjustment knob in the direction of the minus 

symbol (-)

- relieve pressure from the pressure reducing valve for a 

short while.

- turn the adjustment knob in the direction of the plus 

symbol (+) and watch the outlet pressure manometer. 

- Re-tighten the screw (7) when the desired pressure 

value is reached.

8

Depressuris. plug

4

3

5

2

1

6

7

8

Clean the function parts only with clear cold water 

without adding detergents or descalers.

Reviews: