SwitchPak - SPAK 4S/2D Conversion
Installation Instructions
Part No. CDCS000312 Rev A
Page 2
8/11
Synergy Lighting Controls
Conyers Ga, 30012
TEL : (800)-533-2719 www.Synergylightingcontrols.com
1.
Always disconnect all power.
2.
Install in accordance with the National Electrical
Code and any other codes which may apply.
3.
Use only as intended and at the listed voltage.
4.
All installation and service must be performed by
qualified personnel or service technicians.
5.
These components are designed for use with
SYNERGY SPAK products ONLY.
6.
Do not discard these instructions, this document is
a reference for installation, programming, operation,
and maintenance of the system.
7.
All installation and wiring information contained
herein is based on industry-accepted standards and
practices. This information is not meant to conflict
with or overrule any applicable codes or ordinances.
If any conflicts exist, please contact Synergy Lighting
Controls before proceeding with the installation.
8. Document all wiring, device terminations and
locations. This information will be necessary to
correctly configure the system and perform the
system start up .
9.
USE EXTREME CAUTION WHEN PERFORMING
MAINTENANCE ON THIS EQUIPMENT. HIGH
VOLTAGE IS PRESENT INSIDE THE ENCLOSURE!
Failure to follow any or all warnings and proper safety
procedures can cause severe injury or death, and/
or damage to the equipment.
Before You Start
The SPAK 4S2D conversion kit contains (2) double pole relays and components necessary to convert a standard SPAK 8S
(contains 8 single pole relays) into a SPAK 4S2D (contains 4 single pole and 2 double pole) relays. The double pole relays
and the electronic assembly in the kit replace one SPAK 4S relay board assembly.
1.
Disconnect power from SPAK.
2.
Open enclosure to gain access to line voltage
compartment of SPAK.
3.
Disconnect load wires from relay terminals of the 4S
relay board to be removed (if installed)
4.
Disconnect ribbon cable from header on relay board.
(See Figure 1)
5.
Remove the relay board. Use pliers to squeeze the
tab in the top of each standoff, and gently wiggle the
board to loosen it. Once all 5 standoffs have been
released, remove the board. (See Figure 1)
6.
Install the 2D relay card assembly in the SPAK (See
Figure 3).
7.
Connect the black and white input wires from the
controller board to the power input terminal block.
(See Figure 4)
8.
Connect the ribbon cable to the header on the relay
board. (See Figure 4)
9.
Connect loads to relays. (See Figure 5)
WARNING:
Test branch circuits for short circuits
prior
to
energizing the SwitchPak.
DO NOT apply power to the SPAK and load circuits
until after testing for short circuits.
Warranty void
if
power is applied to shorted loads.
2D Relay Assembly Installation
Double Pole Relay Operation
The eight SPAK 8S single pole relays correspond to Relays
1-8 on the SPAK keypad and in SPAK programming. The
SPAK 2D double pole relay card assembly replaces the
lower 4S (single pole) relay card. (This causes Relay 7
and 8 on the SPAK keypad to no longer control any relays
(they have been removed). To operate the newly installed
2D double pole relays, use Relay 5 and 6 on the SPAK
keypad and in all SPAK programming.
DISCONTINUED