Synergy SwitchPak SPAK 4S/2D Installation Instructions Manual Download Page 1

SwitchPak  - SPAK 4S/2D Conversion

Installation Instructions

Part No. CDCS000312 Rev A

Page 1

8/11

Synergy Lighting Controls

     Conyers Ga, 30012

TEL : (800)-533-2719     www.Synergylightingcontrols.com

    WARNING

To reduce the risk of death, injury or property damage from fire, electric shock, cuts, 

abrasions, falling parts, and other hazards:

• 

Service of the equipment must be performed by qualified service personnel.

• 

Installation and maintenance must be performed by a person familiar with the construction 

and operation of this product and any hazards involved. All applicable codes and ordinances 

must be followed.

• 

Read this document before installing, servicing, or maintaining this equipment. These 

instructions do not cover all installation, service, and maintenance situations. If your situation 

is not covered, or if you do not understand these instructions or additional information is 

required, contact 

Synergy Lighting Controls.

    WARNING

Before installing, servicing, or maintaining this equipment, follow these general precautions.

To reduce the risk of electrocution:

• 

Make sure the equipment is properly grounded.

• 

Always de-energize any equipment before connecting to, disconnecting from, or 

servicing the equipment.

To reduce the risk of fire:

• 

Use supply conductors with a minimum installation temperature rating as specified.

To reduce the risk of personal injury from cuts, abrasions:

• 

Wear gloves to prevent cuts or abrasions from sharp edges when removing from 

carton, handling and maintaining this equipment. 

• 

Do not install a damaged equipment.

Synergy Lighting Controls, 

a division of 

Acuity Brands

 Inc., assumes no responsibility for claims arising out of 

improper or careless installation or handling of this product. 

SAVE THESE INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS

READ AND FOLLOW ALL SAFETY INSTRUCTIONS!

SAVE THESE INSTRUCTIONS AND DELIVER TO OWNER AFTER INSTALLATION 

!

!

DISCONTINUED

Summary of Contents for SwitchPak SPAK 4S/2D

Page 1: ...s or additional information is required contact Synergy Lighting Controls WARNING Before installing servicing or maintaining this equipment follow these general precautions To reduce the risk of electrocution Make sure the equipment is properly grounded Always de energize any equipment before connecting to disconnecting from or servicing the equipment To reduce the risk of fire Use supply conducto...

Page 2: ...onvert a standard SPAK 8S contains 8 single pole relays into a SPAK 4S2D contains 4 single pole and 2 double pole relays The double pole relays and the electronic assembly in the kit replace one SPAK 4S relay board assembly 1 Disconnect power from SPAK 2 Open enclosure to gain access to line voltage compartment of SPAK 3 Disconnect load wires from relay terminals of the 4S relay board to be remove...

Page 3: ...ctions Part No CDCS000312 Rev A Page 3 8 11 Synergy Lighting Controls Conyers Ga 30012 TEL 800 533 2719 www Synergylightingcontrols com Figure 1 Remove 4S Relay Card 4S RELAY CARD STANDOFFS RIBBON CABLE STANDOFFS SPAK 8S DETAILS D I S C O N T I N U E D ...

Page 4: ...Controls Conyers Ga 30012 TEL 800 533 2719 www Synergylightingcontrols com Figure 2 Wiring Details WHITE WIRE COIL NEUTRAL RED WIRE COIL 2 BLUE WIRE COIL 1 WHITE WIRE INPUT WHITE WIRE COIL NEUTRAL ATTACH BLACK INPUT WIRE TO TERMINAL ATTACH WHITE INPUT WIRE TO TERMINAL POWER INPUT TERMINAL D I S C O N T I N U E D ...

Page 5: ...ion Installation Instructions Part No CDCS000312 Rev A Page 5 8 11 Synergy Lighting Controls Conyers Ga 30012 TEL 800 533 2719 www Synergylightingcontrols com Figure 3 Install Card Relay Assembly in Cabinet D I S C O N T I N U E D ...

Page 6: ...000312 Rev A Page 6 8 11 Synergy Lighting Controls Conyers Ga 30012 TEL 800 533 2719 www Synergylightingcontrols com Figure 4 Connect Power Input Wires CONNECT RIBBON CABLE TO HEADER ON BOARD CONNECT POWER INPUT WIRES TO INPUT POWER TERMINAL BLOCK D I S C O N T I N U E D ...

Page 7: ...o the cabinet power supply 2 Connect a 120 or 277 volt 30 amp maximum 2 pole branch circuit breaker to the 2 pole relay terminal positions labeled LINE Figure 5 Load Connections 4S 2D 4 Single Pole 2 Double Pole LOAD LOAD COIL OUTPUTS 7 AND 8 COIL OUTPUTS 5 AND 6 RELAY 4 LINE BLUE RED LOAD RELAY 1 RELAY 2 RELAY 3 LOAD LINE LOAD LINE LOAD LINE N LINE LINE LOAD LOAD LINE LINE COIL NEUTRAL WHITE COIL...

Reviews: