background image

S21315 / S21318 User Manual 

 

ALLNET GmbH 

 

1.3 Front Panel and Rear Panel Specifications 
 

The front panel of 5/8-Port Desktop Gigabit Ethernet Switch 

includes  5/8  Link/Act  indicators  and  one  power  indicator. 

Please refer to the detailed description of these indicators 

in 

LED Indicator Specifications. 

 

 

 

The front panel of the Switch 

The Rear Panel of the Switch includes 5/8 10/100/1000Mbps 

RJ-45  ports  and  one  AC  power  port  used  for  AC  power 

input. 

 
 
 
 
 

The rear panel of the Switch 

 

Notice

Please use the delivery-attached power adapter. If not, 

the switch may be damaged. 

 
 
 
 
 
 

Summary of Contents for S21315

Page 1: ...S21315 S21318 User Manual ALLNET GmbH S21315 S21318 5 8 10 100 1000 Mbps Ethernet Switch...

Page 2: ...itch Features 4 1 2 Package Contents 5 1 3 Front Panel and Rear Panel Specifications 6 1 4 LED Indicator Specifications 7 2 Installation 9 2 1 Before Connecting to the Network 9 2 2 Connecting to End...

Page 3: ...as Uplink ports connected to other networking devices You can replace the 10 100Mbps switch with the G1005D G1008D to resolve the bottleneck issues of server terminal connectivity because the speed a...

Page 4: ...ction Provides 5 8 10 100 1000Mbps Auto Negotiation RJ 45 ports Supports IEEE802 3x flow control for full duplex and Backpressure flow control for half duplex Provides up to 10 16Gbps backplane bandwi...

Page 5: ...se check the articles carefully after you open the packing as below One 5 8 Port Desktop Gigabit Ethernet Switch One Power Adapter One User Guide If any of the listed items are missing or damaged plea...

Page 6: ...nd one power indicator Please refer to the detailed description of these indicators in LED Indicator Specifications The front panel of the Switch The Rear Panel of the Switch includes 5 8 10 100 1000M...

Page 7: ...Specifications The LED indicators of the Switch include Power and 5 8 Link Act indicators You can see their operating situation through these LED indicators The following chart shows the LED indicator...

Page 8: ...onnector to ensure proper connectivity of the power cable and the Switch Link Act Green ON Indicates the Switch is connected at 1000Mbps Blinking Indicates the Switch is transmitting receiving data pa...

Page 9: ...the network please pay attention to the following instructions Don t put heavy articles on the Switch Power sockets and equipments should be within 1 5 meters of the Switch Check power adapter to con...

Page 10: ...e Switch to end nodes as described below Switch ports will automatically adjust to the characteristics speed duplex of the device to which is connected Switch connecting to an end node Please refer to...

Page 11: ...ser Manual ALLNET GmbH 2 3 Switch to Router or Switch Connecting to another router or switch Please refer to the LED Indicator Specifications The Link Act LEDs for each port are turned on when the lin...

Page 12: ...t 6 UTP STP Speed 10 100 1000Mbps Transmission Method store and forward MAC Address Table 8K entries Packet Filtering Forwarding Rate 14880pps 10Mbps per port 148800pps 100Mbps per port 1488000pps 100...

Page 13: ...the CE sign on the device The Synergy21 S21315 S21318 5 8 Port 10 100 1000 Ethernet Switch conforms to the Council Directives of EC EMC 2004 108 EC This equipment meets the following conformance stan...

Page 14: ...ally including but not limited to by way of photocopying recording information recording or through retrieval systems without the express written permission of the owner Product specifications contain...

Page 15: ...S21315 S21318 User Manual ALLNET GmbH ALLNET Deutschland GmbH Maistrasse 2 82110 Germering Tel 49 89 89 4222 22 Fax 49 89 89 42 24 33 email info allnet de...

Reviews: