![Symphony SYK-1019 Setup Instructions Download Page 8](http://html1.mh-extra.com/html/symphony/syk-1019/syk-1019_setup-instructions_1420367008.webp)
© 2021
Step 4 of 5
Order #XXXXX
Locked layer contains
placeholder marks.
Completed Assembly
Steps:
1) Connect Floating Graphics to backwall using
brackets. See
Floating Graphic Attachment
detail.
Floating Graphic Attachment
Hook the Graphic Bracket
onto the extrusion & snap
into place.
Affix graphic to Bracket
using Velcro.
Brackets may be attached to
horizontal or vertical extrusion.
Two (2) brackets are required per graphic.
1
2
Graphic Bracket
Velcro
TOP VIEW
Extrusion
Hook Bracket
over
vertical
Snap into
place
Velcro
Velcro
Velcro
Bracket
Bracket
*
Graphic
*
*
*
*
Floating
Graphic
Floating
Graphic
Backwall Attachments (cont’d)