
4
Installation
Symmons Industries, Inc.
■
31 Brooks Drive
■
Braintree, MA 02184
■
(800)796-6667
■
Fax: (800)961-9621
©2014 Symmons Industries, Inc.
■
www.symmons.com
■
■
ZV-3073 REV 0 09/18/14
Note:
For valve body installation, please
see valve body installation guide.
1) Install secondary integral
diverter handle (P) into shower
escutcheon (L).
2) Install shower escutcheon plate (K)
and shower escutcheon (L) to shower
valve. Secure with two screws (I).
3) Install dome cover (J) and
washer (H) to valve and secure
with lock nut (G).
4) Install o-ring (F), flange (E), and
handle (D) to valve and secure
with screw (C).
Note:
Handle should be facing the
6 o'clock position.
5) Install tub spout (Q) to pipe
fitting. Turn clockwise to secure.
6) Install wall elbow (B) to pipe
fitting. Turn clockwise to tighten.
L
P
1
2
3
I
K
L
1
2
J
G
H
1
2
B
1
2
C
E
D
F
1
2
Q