
3
Installation
G
J
2) Install shower escutcheon (G) to
shower valve. Secure with two
screws (F).
1
G
F
2
1) Install diverter handle or volume
control handle (J) into shower
escutcheon (G).
3) Install dome cover (E) to valve by
turning clockwise.
E
1
2
4) Install handle (D) to valve and
secure with set screw (H). Install
plug button (I).
H
I
D
1
2
5) Attach shower arm (B) and flange
(C) to vertical shower pipe. Turn
clockwise to tighten.
B
1
2
C
Installation note:
For valve body installation, please see valve body manual.
Note:
Handle should be facing the 12
o’clock position.
6) Install showerhead (A) to shower
arm (B). Turn clockwise to tighten.
B
1
2
A
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.
Operation (Temperature Control)