Installation Steps
When installing the 7875 Scanner/Scale, follow the installation
steps below. Skip step 4 if the unit does not have a scale.
1. Verify Checkstand Preparation, see page
-
Checkstand Cutout
-
Display Clearance
-
Service Clearance
-
Item Diverter
-
Ventilation Requirements
-
Electrical Wiring
-
Cable Hole Requirements.
2. Connect the Cables, see page
-
Power Supply
-
Remote Display
-
Interface Cables
-
RS-232 Peripheral Cable.
3. Install 7875 in Checkstand, see page
-
Set Communications Protocol Switch
-
Put the 7875 in Checkstand Cutout
-
Align the 7875 to the Checkstand.
4. Calibrate the Scale, see page
-
Access Calibration Switch
-
Exercise the Scale
-
Perform Calibration
-
Validate the Calibration
-
Secure Calibration Switch.
5. Check the Scanner Operation, see page
-
Modify Program Parameters
-
Scan Valid Bar Code Tags.