Copyright © 2017 Symantec Corp. All rights reserved. Symantec, the Symantec Logo, the Checkmark Logo, Blue Coat, and the Blue Coat logo are trademarks or registered trademarks of Symantec Corp. or its affiliates in the U.S. and other countries. Other names may be trademarks of their respective owners. This document is provided for informational purposes only and is not intended as advertising. All warranties relating to the information in this
document, either express or implied, are disclaimed to the maximum extent allowed by law. The information in this document is subject to change without notice. Part Number: 231-03311 Rev A.1
THE DOCUMENTATION IS PROVIDED “AS IS” AND ALL EXPRESS OR IMPLIED CONDITIONS, REPRESENTATIONS AND WARRANTIES, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT, ARE DISCLAIMED, EXCEPT TO THE EXTENT THAT SUCH DISCLAIMERS ARE HELD TO BE LEGALLY INVALID. SYMANTEC CORPORATION SHALL NOT BE LIABLE FOR INCIDENTAL OR
CONSEQUENTIAL DAMAGES IN CONNECTION WITH THE FURNISHING, PERFORMANCE, OR USE OF THIS DOCUMENTATION. THE INFORMATION CONTAINED IN THIS DOCUMENTATION IS SUBJECT TO CHANGE WITHOUT NOTICE. SYMANTEC CORPORATION PRODUCTS, TECHNICAL SERVICES, AND ANY OTHER TECHNICAL DATA REFERENCED IN THIS DOCUMENT ARE SUBJECT TO U.S. EXPORT CONTROL AND SANCTIONS LAWS, REGULATIONS AND
REQUIREMENTS, AND MAY BE SUBJECT TO EXPORT OR IMPORT REGULATIONS IN OTHER COUNTRIES. YOU AGREE TO COMPLY STRICTLY WITH THESE LAWS, REGULATIONS AND REQUIREMENTS, AND ACKNOWLEDGE THAT YOU HAVE THE RESPONSIBILITY TO OBTAIN ANY LICENSES, PERMITS OR OTHER APPROVALS THAT MAY BE REQUIRED IN ORDER TO EXPORT, RE-EXPORT, TRANSFER IN COUNTRY OR IMPORT AFTER DELIVERY TO YOU.
Page 2
DLP-S500 Quick Start Guide
06
Rack-Mount the DLP-S500 Appliance
The included slide-rail rack-mounting kit allows you to install the appliance in a two- or
four-post rack. The kit is comprised of the following parts:
To install the DLP-S500 in a four-post equipment rack, you may need the following tools
and hardware:
o
M4 nut driver
o
Rack specific screws
o
Adjustable wrench
o
Headlamp (recommended)
o
#2 Phillips head screwdriver
Note:
You must remove the inner rail from Rail A before rack-mounting the appliance.
Refer to the
S-Series Maintenance and Upgrade Guide
for instructions.
To install the DLP-S500 into a four-post equipment rack:
a.
Attach the inner rails to the appliance:
o
Align the inner rail to the four mounting posts on the side of the chassis and lock
the rail into position by sliding it toward the rear of the appliance (A). Make sure
that all six mounting posts snap into the slots in the inner rail.
o
Install two (2) M3 screws to secure the inner rail to the appliance (B).
o
Repeat the previous steps for the opposite inner rail.
b.
Assemble the slide-rails:
o
Loosely attach Rail C to Rail A. The precise attachment location will depend
on how far Rail C must be extended or retracted to fit the rack model. It may
be necessary to remove Rail C from Rail A to determine the proper installation
length for the rack.
o
Temporarily mount Rail C to Rail A:
•
Align the front- and rear-mounting faces against the rack. Make sure
that the slide-rail mounting faces are on the outside of the rack’s vertical
rails.
•
After you have determined the installation length, temporarily install three
(3) M3 screws in the slot in Rail C. Make sure the screws are equidistant from
each other to distribute the load on the rail.
o
Repeat the previous steps for the opposite slide-rail.
c.
Mount the slide-rail assemblies in the four-post rack:
o
Place the assembled slide-rail against the rack and secure the Rail A front bracket
to the outside face of the rack using two (2) rack screws (A). Do not fully tighten the
screws just yet. You will do so after the appliance is installed in the rack.
o
Extend or retract Rail C to align the mounting face of the bracket with the outside
face of the rack and secure it with two (2) rail screws (B). Do not fully tighten the
screws just yet. You will do so after the appliance is installed in the rack.
o
Tighten the Rail C side-mounting screws (C).
o
Repeat the previous steps for the opposite slide-rail assembly. Verify that both
slide-rail assemblies are installed at the same height in the rack.
d.
Install the appliance in the rack:
o
Align the grooves on the inner rail with the grooves on Rail A and slide the
appliance half-way into the rack (A).
o
Press the gray tab on the inner rails to slide the appliance all the way into the
rack (B).
o
Slide the appliance out of the rack, far enough to access the rack-mounting screws.
Fully tighten the Rail A and Rail C rack-mounting screws to secure the slide-rails to
the rack.
o
Gently push the appliance all the way to the back of the rack.
o
Tighten the thumbscrews on the retaining ears to prevent the appliance from
sliding out of the rack (C).
e.
Reconnect the cables as documented in
Step 2—Connect the Cables
and verify the
appliance is functioning as in
Step 3—Verify the LEDs and LCD
.
A
B
C
A
B
C
A
B
B
Rail A
Rail C
Technical Support
o
Contact Information
https://support.symantec.com/en_US/contact-support.html
o
MySymantec
https://mysymantec.force.com/customer/s/
Documentation
Symantec Data Loss Prevention Software Documentation
o
https://support.symantec.com/en_US/dpl.56500.html
DLP-S500 Appliance Documentation
o
S-Series Maintenance and Upgrade Guide
http://www.symantec.com/docs/DOC9795
o
S500 Series Safety and Regulatory Compliance Guide
http://www.symantec.com/docs/DOC10248
Hardware Pack
M3 T-Type Screw x 10
M6 Screw x 8
M6 Cage Nut x 8 (optional)
Inner Rail x 2
Rail A x 2
Rail C x 2
CAUTION:
Before rack-mounting the appliance:
o
Power off the appliance and disconnect all cables.
o
Verify that the weight of the system does not exceed the rack’s
fully populated weight limit. For more information, refer to the
manufacturer’s instructions included with the rack.
o
For weight stability, load the rack from the bottom up.
o
Read the “Rack Mount Warnings” section of the included
Safety and
Regulatory Compliance Guide
.
o
Take adequate safety and grounding measures to avoid creating an
electrical shock hazard and to prevent bodily injury.
For comprehensive information on the slide-rail rack mounting kit, see
the
S-Series Maintenance and Upgrade Guide
at: