5. ENGINE REMOVAL
5-6
Loosen speedometer cable mounting nut, and
then remove the cable.
Remove 3 bolts and remove drive chain protector.
Turn the socket bolt clockwise, and then remove
speedometer gear box.
Caution
The socket bolt is provided with left turn
thread.
Remove 2 bolts, and then remove the drive
sprocket fixing plate, drive chain and drive
sprocket.
Remove the rear side engine hanger mounting
nuts and bolts.
Remove the front side engine hanger mounting
nut and bolt
Remove left side engine hanger, and then remove
engine by left side.
Engine Installation
Check if the bush of engine hanger parts for
damage.
Install engine in the reverse procedures of
removal.
Caution
y
Pay attention of foot & hand safety as engine
installation to avoid hurting.
y
Do not bend or twist wires.
y
Cables wires have to be routed in accordance
with normal layout.
Engine hanger Bolt:
Torque value: 7.5~9.5kgf-m
2 nuts
2 bolts
1 nut
Speedometer cable
Socket bolt
3 bolts
Summary of Contents for Quad Lander 250
Page 1: ...Quad Lander 250 SERVICE MANUAL FORWARD HOW TO USE THIS MANUAL CONTENTS SERIAL NUMBER ...
Page 5: ...SERIAL NUMBER Frame number Engine number Home page Contents ...
Page 45: ...3 LUBRICATION SYSTEM 3 8 Notes To this chapter contents ...
Page 57: ...4 FUEL SYSTEM 4 12 Notes To this chapter contents ...
Page 123: ...10 ALTERNATOR STARTING CLUTCH 10 10 Note To this chapter contents ...
Page 171: ...14 FRONT BRAKE FRONT WHEEL 14 14 Notes To this chapter contents ...
Page 221: ...17 ELECTRICAL SYSTEM 17 22 Notes To this chapter contents ...
Page 222: ...18 ELECTRICAL DIAGRAM 18 1 18 Home page Contents QUAD LANDER 250 ELECTRICAL DIAGRAM ...
Page 223: ...18 ELECTRICAL DIAGRAM 18 2 Notes Home page Contents ...