
23
INSTALLER
Fix the profiles to the front studs.
Proceed as follows:
- Screw the nuts (8) and washers (11) as far down as possible over the studs
- Fit the profiles (6) over the studs
- Fix the profiles in place with the nuts (8)
Fix the mounting brackets (5) to the profiles (6) with the M8 screws (12) and nuts (9).
M12
M12
860 mm 150/1 - 200/1 - 220/2
1040 mm 300/2 - 300/3
M8
M8
8
8
6
6
5
11
Summary of Contents for SN 150/1 T
Page 1: ...NATURAL CIRCULATION SYSTEMS SN TI INSTALLER TECHNICAL ASSISTANCE CENTRE AND USER MANUAL ...
Page 18: ...18 INSTALLER Position the collector pivoting it on the support bar 7 7 ...
Page 21: ...21 INSTALLER Position the collector pivoting it on the support bar 7 7 ...
Page 22: ...22 INSTALLER Secure the collector with the top fixing brackets 3 3 9 4 ...
Page 34: ...34 END USER ...
Page 35: ...35 END USER ...