THIS SLIDE MUST NOT BE INSTALLED OVER CONCRETE, GRAVEL, PACKED EARTH, ASPHALT OR ANY
OTHER HARD SURFACE WHICH COULD CAUSE SERIOUS INJURY IN THE EVENT OF A FALL.

Installation Instructions

IMPORTANT: Attach the slide on level ground, not less than six feet (1.828 meters) from any structure or
obstruction such as a fence, garage, house, overhanging branch, laundry line or electrical wire. Protective
surfacing must extend a minimum of 6 ft. (1.828 m) in all directions from the perimeter of the equipment or from
the outermost edges of any component.  A slide extending beyond the platform must have protective surfacing at
least 6 ft. (1.828 m) out from both sides as well as the end.  An area of 21" on either side of the slide should be
free of obstructions which a child's arm could contact while sliding..

1. Make sure slide opening is between 23 -1/4'' and 28''. (Fig. 2 represents a typical slide attachment opening). If

not, prepare slide attachment opening by cutting two 2'' x 4'' x 5'' and one 2'' x 4'' to the width of slide opening
shown in (See Fig. 2). Place the 2'' x 4'' x 5'' deck supports so that the top of the 2'' x 4'' deck board is flush
with the top surface of the existing deck boards. (See Fig. 3) 

2. Align top of slide square with platform opening. NOTE: Slide should be 90 degrees to deck. Mark hole locations

approximately 1-1/2'' from the front edge of the slide platform (See Fig. 1).Remove slide and drill 1/8'' pilot
holes at the corner hole locations. Drill 3/8'' holes through the remaining hole locations. 

NOTE: Each 3/8 '' hole

must be counterbored on the UNDERSIDE of the deck approximately 5/8'' deep using a 1-1/8'' spade bit. (See
Fig. 1)

3. Attach the top of the slide to the deck with two 1-1/2'' screws at the corner hole locations,  two 2'' carriage

bolts, washers and nuts. (See Fig. 1) 

CAUTION: If any threads of the bolt extend beyond the nut, remove the

excess using a hacksaw. Remove the sharp edges using a metal file.

4. Prepare a level area of ground where the bottom of the slide will rest. 

NOTE: The bottom of the slide should rest 2'' below grade (See Fig. 4)  At the bottom center of the slide drive
a 2'' x 4'' x 18'' stake. The top of the stake should be flush  2'' below grade.(See Fig.4) 

5. Using a 1/8'' drill bit, drill a hole through the base of the slide and into the stake. Secure the bottom of the slide

to the stake using the wood screw and washer provided. Level ground around the base making sure the head
of the screw is covered and presents no hazard.  

Instalación segura - ¿Está seguro que:

Consultó toda la información de cómo armar lo que vino con su

modelo particular?

Verificó que su tobogán es compatible con la altura de la plataforma a

la cual va a sujetarse?

Verificó que se recibieron todas las partes y piezas, y que éstas

concuerdan con la lista departes?

Notó que este tobogán solamente se lo usa en los diseños aprobados

de Timber•Bilt? (No alteró su diseño o añadió/quitó componentes.) 

Puede garantizar que todos los herrajes están bien apretados?

Usando una sierra para metales, cortó todas las roscas de los pernos

y otras tuercas y tornillos para quitar los filos agudos usando una lima

para metales?

Puso el tobogán en suelo nivelado, a una distancia de no menos de

seis pies (1,8 metros) de cualquier estructura u obstrucción tal como

una cerca, garaje, casa, ramas de árbol cercanas, cuerdas de 

lavandería, o alambres eléctricos?

Hizo los sostenes de forma apropiada a las 

dimensiones apropiadas?

Ancló y sujetó los sostenes y/o las estacas dentro de la tierra como

se requiere?

Se aseguró que el tobogán no está instalado sobre hormigón, asfalto,

tierra bien comprimida, o cualquier otra superficie dura? (Una caída

sobre una superficie dura podría resultar en lesiones graves a la

persona que usa el equipo.)

Siguió todos los requerimientos de sujetar y hacer superficies que

absorban golpe tal como se aplica al plan del conjunto recibido?

Garantizó no permitir a los niños el uso del equipo hasta que esté

instalado en forma apropiada?

Operación segura - ¿Se aseguró que:

Ha determinado que supervisión de adultos en el lugar, está siempre

presente para chiquillos de cualquier edad?

Enseño a los niños lo que sigue antes de permitirles el uso del

equipo?
• No usar el equipo de ningúna otra manera de la que se intenta.

• No treparse al equipo cuando esté mojado. 

Ha determinado cómo los niños deben estar 

vestidos apropiadamente para jugar (evitar ropa 

con algún tipo de cordel y ropa floja que podría enredarse o

agarrarse al equipo.)

Mantenimiento seguro - ¿Ha decidido usted que:

Verificará que todas las tuercas y pernos estén apretados dos veces

por mes durante la temporada de juego tal como se requiere, y los

aprieta si se requiere? (Es particularmente importante que se siga el

procedimiento al comienzo de cada 

temporada de juego.)

Verificará visualmente que los herrajes durante la temporada de

juego no muestran evidencia de 

deterioración? (Se los debería de reemplazar de acuerdo a las

instrucciones del fabricante.)
Instrucciones para desechar

Cuando se saque al equipo de servicio, éste debe estar desarmado y se

lo debe desechar de tal manera que no existan peligros imprevistos

cuando se lo deseche.

CUIDADO: EL NO SUJETAR LA PARTE DE ABAJO DEL TOBOGÁN A LA ESTACA EN LA

TIERRA PODRÍA RESULTAR EN LESIONES GRAVES A NIÑOS, AL LEVANTARSE EL EXTREMO DE ABAJO DEL TOBOGÁN.

Lista de chequeo para los toboganes Swing•N•Slide™

Cumpliendo con las siguientes declaraciones y advertencias reduce la posibilidad de lesiones graves o fatales. 

¡IMPORTANTE! Instrucciones de seguridad adicionales para todo el equipo de recreo Timber•Bilt. 

Guarde este hoja de instrucciones en caso de que se necesite poner en contacto con el fabricante.

Installation Safety - Have You:

Consulted the assembly instructions supplied with your particular model?

Made sure your slide is compatible with the deck height to which it is to be
attached?

Checked to make sure all parts are received and match the parts list?

Noted this slide is to be used only on Timber•Bilt approved designs? (Do not
alter its design or add/remove components.)

Made sure all hardware is tightened securely?

Using a hacksaw, cut off all protruding threaded ends of bolts and other
fasteners and remove any sharp edges with a metal file as needed?

Placed the slide on level ground, not less than six feet (1.8 meters) from any
structure or obstruction such as a fence, garage, house, overhanging branch,
laundry line or electrical wire?

Built the braces properly and to proper dimensions?

Anchored the braces and/or stakes into the ground as required?

Made sure slide is not installed over concrete, asphalt, packed earth or any
other hard surface? (A fall onto a hard surface can result in serious injury to
the equipment user.)

Followed all anchoring and shock absorbing surfacing requirements in the kit
plan as they apply?

Made sure not to allow children to use equipment until it is properly installed?

Operating Safety - Have You:

Determined that on-site adult supervision is 
provided for children of all ages?

Taught children the following before allowing them to use the equipment?

• Not to use equipment in a manner other than intended.
• Not to climb on the equipment when it is wet.

Determined children must be dressed appropriately for play? (Avoid clothing
with draw strings and loose fitting clothes which could become 
entangled or snagged on equipment.)

Safety Maintenance - Have You Resolved to:

Check all nuts and bolts twice monthly during the usage season for tightness
and tighten as required? (It is particularly important that this procedure be
followed at the beginning of each season.)

Check hardware monthly during usage season for evidence of deterioration?
(Replacement should be made in accordance with manufacturer’s 
instructions.)

Disposal Instructions
When the equipment is taken out of service, it must be
disassembled and disposed of in such a way that no
unreasonable hazards will exist at the time the set is
discarded.

CAUTION: FAILURE TO PROPERLY STAKE THIS SLIDE TO THE GROUND COULD RESULT

IN SERIOUS INJURY TO CHILDREN FROM LIFTING THE END OF THE SLIDE.

Safety Checklist for Swing•N•Slide Slides

Observing the following statements and warnings reduces the likelihood of serious or fatal injury.

Important!

Additional Safety Instructions for all Swing•N•Slide Playset Equipment. Save this instruction sheet in the event the manufacturer needs

to be contacted.

Lumber Requirements:

One  2" x 4" x 8'  (not included)

FIG. 4

1-1/2"

FIG. 1

FIG. 3

FIG. 2

Washer

Washer

Deck Board

Carriage Bolt

Perno de carruaje

2'' x 4'' Deck Board

2'' x 4'' x 5''

Wood Screw

Surfacing

Material

2'' Below Grade

18'' Stake

Nut

5/8" Deep Counterbore

2'' x 4'' Deck Board

2'' x 4'' x 5''

TYPICAL OPENING

NO DEBE INSTALARSE ESTE TOBOGÁN SOBRE HORMIGÓN, GRAVA, TIERRA BIEN EMPACADA,
ASFALTO, U OTRA SUPERFICIE QUE PODRÍA CAUSAR LESIONES GRAVES EN CASO DE UNA CAÍDA.

Instrucciones para la instalación

IMPORTANTE: Ubique el tobogán en suelo nivelado, alejándose por lo menos seis pies (1,828 metros) de
cualquier estructura u obstrucción tal como cercas, garaje, casa, ramas de árbol bajas, cuerda para lavandería, o
alambres eléctricos. La superficie protectora debe extenderse por 

lo menos 6 pies (1,828 m.), en todas las

direcciones del perímetro del equipo o de uno de los filos de más afuera de cualquier componente. Un tobogán
que se extienda más allá de la plataforma debe tener superficie protectora de al menos 6 pies (1,828 m.) de
ambos lados, al igual del extremo. Un área de 21" a cada lado del tobogán no debe tener obstrucciones que
podrían causar que el brazo del niño lo contacte.

1. Asegúrese que la abertura para el tobogán se encuentra entre 23 -1/4'' y 28''. (Fig. 2 representa una abertura

típica para conectar un tobogán). Si no es así, prepare la abertura para el tobogán al cortar dos 2'' x 4'' x 5'' y
un 2'' x 4'' al ancho de la abertura del tobogán como se muestra (Vea la Fig. 2). Coloque los soportes de 2'' x
4'' x 5'' de la plataforma de tal manera que la parte superior de la tabla de 2'' x 4'' para plataforma, se
encuentre alineada con la superficie superior de las tablas existentes para la plataforma. (Vea la Fig. 3) 

2. Alinee el cuadro de la parte superior del tobogán con la abertura en la plataforma. NOTA: El tobogán debería

estar a 90 grados de la plataforma. Marque el lugar para los orificios aproximadamente a 1-1/2'' de la orilla
frontal de la plataforma del tobogán (Vea la Fig. 1). Remueva el tobogán y taladre orificios pilotos de 1/8'' en
los orificios ubicados en la esquina. Taladre orificios de 3/8'' a través de los lugares restantes para los orificios.
NOTA: Cada orificio de 3/8 '' debe tener un diámetro alargado en el LADO INFERIOR de la plataforma, de
aproximadamente 5/8'' de profundidad, usando una mecha de pala de 1-1/8''. (Vea la Fig. 1)

3. Conecte la parte superior del tobogán a la plataforma usando dos tornillos de 1-1/2'' en los lugares para los

orificios en la esquina, dos pernos de carruaje de 2'', arandelas y tuercas. (Vea la Fig. 1) 

ADVERTENCIA: Si

parte de las roscas del perno se extiende más allá de la tuerca, remueva el exceso usando un serrucho para
metales. Remueva las puntas agudas usando una lija para metales.

4. Prepare un suelo nivelado donde la parte inferior del tobogán pueda descansar. NOTA: La parte inferior del

tobogán debería descansar 2'' por debajo del nivel del suelo (Vea la Fig. 4) En el centro inferior del tobogán
empuje una estaca de 2'' x 4'' x 18''. La parte superior de la estaca debería quedar alineada por debajo del
nivel de 2'' del suelo. (Vea la Fig.4) 

5. Usando una mecha de 1/8'' del taladro, perfore un orificio a través de la base del tobogán y la estaca. Asegure

la parte inferior del tobogán a la estaca, usando el tornillo para madera y la arandela provistos. Nivele el suelo
alrededor de la base, asegurándose que la cabeza del tornillo quede cubierta y no represente un peligro.

Tale los Requisitos: 

uno 2" X 4" X 8' (no incluyó)

FIG. 4

1-1/2"

FIG. 1

FIG. 3

FIG. 2

Arandela

Arandela

Tabla para la plataforma

Tabla de 2'' x 4'' 

para la plataforma

2'' x 4'' x 5''

Tornillo para madera

Material para la

superficie

2'' por debajo

del nivel

Estaca de

18''

Tuerca

Diámetro alargado de 5/8"

de profundidad

Tabla de 2'' x 4'' para la plataforma

2'' x 4'' x 5''

ABERTURA TÍPICA

NOTE: Carriage Bolt and
1-1/4'' Screw at corner

La NOTA: Perno de carruaje y

1-1/4'' el Tornillo en rincón

                      

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

 

    

 

    

 

    

 

 

    

 

    

 

   

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

    

 

 

    

 

    

 

    

    

 

 

    

 

    

 

    

 

 

                               

Reviews: