Swing-N-Slide PB 8205 Assembly Instructions Manual Download Page 3

This product is intended for single family home/residential use only and not intended for use in any public setting. 

Placement in any public setting constitutes a misuse of this product.

IMPORTANT

!

ADDITIONAL REQUIRED SAFETY INSTALLATION INSTRUCTIONS

According to ASTM requirements, all kits must be anchored to the ground and, if the unit has a climbing rope, the rope end must be anchored to the ground.  If soil conditions
permit stakes to be pulled out easily, cementing into ground is necessary.

•  To anchor the unit to the ground, Follow the instructions included in this plan for applying Anchor-It devices to your unit, or use 2" x 4" x 18" (45mm x 95mm x 457mm) pressure-

treated stakes.  Pound stakes into ground at least 12" (305mm) at all inside corners of the posts (including A-frame legs and climbing unit posts).  Attach with four (4) 16D (3-1/2")
galvanized nails per stake into each 4" x 4" (95mm x 95mm) post.

•  If the unit has a climbing rope, anchor the rope end.  

•  Once the unit is completely assembled and before children are allowed to play on it, proper shock-absorbing surfacing material must be installed.  This may be accomplished by

using loose-fill materials at a sufficient depth.  The Consumer Product Safety Commission “Handbook for Public Playground Safety” lists the following materials and required
depths that are sufficient for home/residential application.  For fall height protection up to 9 ft. (2.742m) [recommended for Swing•N•Slide kits]:

LOOSE FILL MATERIAL

REQUIRED (UNCOMPRESSED) DEPTH

1

in. (mm)

Wood Mulch

9" (229mm)

Double Shredded Bark Mulch

9" (229mm)

Uniform Wood Chips

12" (305mm)

Fine Sand

12" (305mm)

Fine Gravel

12" (305mm)

These depths were derived from the CPSC Handbook.  Swing•N•Slide has not done independent tests to determine these required depths.

When properly installed, shock absorbing material will completely cover the horizontal baseboards on climbing units.  This protective surfacing must extend a minimum of 6 ft.
(1.828m) in all directions from the perimeter of the equipment or from the outermost edges of any component.  For example, a slide extending beyond the platform must have
protective surfacing at least 6 ft. (1.828mm) out from both sides as well as the end.  For swings, the protective surface must extend at least 14 ft. (6m) out from both the back and
front of the swing when the swing is in its rest position.

3

NOTES:

Summary of Contents for PB 8205

Page 1: ...b site at www swing n slide com or call us at 1 800 888 1232 ASSEMBLY INSTRUCTIONS No of Children Up to 10 Min Use Zone 28 x 30 Set Dim 13 W x 16 L x 12 H Est Building Time 4 8 hr Minimum Use Zone 30...

Page 2: ...hat only one child per planned occupant seat should be allowed on this set at one time Determined children must be dressed appropriately for play Avoid clothing with draw strings and loose fitting clo...

Page 3: ...acing material must be installed This may be accomplished by using loose fill materials at a sufficient depth The Consumer Product Safety Commission Handbook for Public Playground Safety lists the fol...

Page 4: ...anhead screws 4 1 3 4 panhead screws 2 4 Carriage Bolts 391 2 1 2 screws 176 1 1 2 screws 92 2 lag screw 8 4 1 2 Carriage Bolts 10 Loc Nuts 4 5 16 Hex Head Lag Screws 10 Wood Loc Washers ELECTRIC DRIL...

Page 5: ...arberry Drive Janesville WI 53545 1 800 888 1232 www swing n slide com R 1 Name Plate with Hardware 1 Plan 1 T30 Torx Bit 2 EZ Frame Brackets 1 Instructional DVD PB8228 PB8205 Plan 1 T20 Torx Bit 1 Ta...

Page 6: ...25 lbs 2 Play Handles 1 Super Summit Slide with Hardware 1 Pirate s Ladder with Hardware 8 Climbing Rocks with Hardware PB 8228 PB 8205 Assembly Instructions 4 Anchor It 4 Anchor It Straps 1 Disc Swin...

Page 7: ...5 4 x 4 x 23 3 4 12 5 4 x 4 x 36 12 5 4 x 4 x 40 1 2 29 5 4 x 4 x 47 1 2 2 5 4 x 4 x 47 1 2 Center Arch 2 1 x 4 x 44 1 2 2 5 4 x 5 x 47 1 2 Center Arch 1 5 4 x 5 x 47 1 2 Offset Arch 1 1 x 5 x 31 3 4...

Page 8: ...rews Use 1 3 4 screws when mounting 5 4 boards to 5 4 x4 boards How to select the correct fastener Use these 2 pictorial guides to help select the correct fastener s for the lumber attachment you are...

Page 9: ...ed splinter free uprights for residential play sets Offered exclusively in our premium stained NO Cut play sets 900 Denier Ballistic Polyester UV protected exterior fabric covers cosmetic lumber imper...

Page 10: ...NOTE PLACE SCREWS IN BRACKETS ONLY WHERE INSTRUCTED DO NOT FILL EVERY HOLE IN BRACKET THIS WILL LEAD TO HARDWARE SHORTAGES Top of bracket Bottom of bracket Hole locations close to bottom Example of a...

Page 11: ...e end and continuing to the other TimberGlove application Step Three 3 Start at beginning and pull Timber Glove tight over 4 x 4 from one end to the other 4 x 4 4 x 4 TimberGlove TimberGlove Step 4 Ti...

Page 12: ...as shown in Fig 1 Fig 2 x 8 4 each bracket 2 Lag screw Fig 1 REMEMBER Brackets are inter locking Cup loc will clip and secure into the Wrap Loc as shown below Insert Lag Screws ONLY where illustrated...

Page 13: ...Frame 1 Frame 1 Frame 1 Construction Use a 2 lag screw to hold bracket in place for later use Look for TOP stamp on brackets while installing TOP GAP on this side WARNING Avoid splitting your lumber b...

Page 14: ...Wrap Loc with one lag screw to hold in place for later use 2 Attach upper board and 2 x 4 as shown in Fig 6 3 Install lag screws at each corner location as shown in Fig 6a Fig 5 Fig 6 GAP 3 2 1 2 scr...

Page 15: ...me Construction cont 1 Install 5 4 and 2 x 4 boards as shown in Fig 7 Fig 7 Frame 2 3 2 1 2 screws per joint 2 1 2 screw 5 4 x 4 x 47 1 2 2 x 4 x 47 1 2 2 x 4 x 47 1 2 91 Double check to make sure str...

Page 16: ...16 PB 8228 PB 8205 Assembly Instructions E Frame Construction cont 1 Install Frame 1 as shown in Fig 8 Fig 8 Frame 1 Frame 2 3 2 1 2 screws per joint 2 1 2 screw 3 2 1 2 screws per joint...

Page 17: ...28 PB 8205 Assembly Instructions 2 Lag screw x 3 Fig 9a F Frame Construction cont 1 Install 4 x 4 beams as shown in Fig 9 2 Install lag screws at each corner location as shown in Fig 9a Fig 9 2 4 x 4...

Page 18: ...1 Install 2 5 4 x 4 x 47 1 2 deck boards as shown in Fig 10 2 Attach 1 2 x 4 x 40 1 4 to deck boards using 2 1 2 screws as shown in Fig 10 2 1 2 screw 19 1 2 2 2 1 2 screws per joint 2 2 1 2 screws pe...

Page 19: ...4 x 4 x 40 1 4 deck boards to structure as shown Fig 11 2 Use two 2 1 2 screws at center and each end of deck boards Note Screws at center will attach to center support 2 1 2 screw Fig 11 2 2 1 2 scre...

Page 20: ...05 Assembly Instructions Fig 13 2 Lag screw x 2 I Install Accessory Brackets 1 Secure Shelf Loc brackets onto Wrap Loc as show in Fig 12 Fig 13 Fig 12 ATTENTION Unit has been rotated 1 4 turn Clockwis...

Page 21: ...uctions Fig 14a Approx 1 4 2 Lag screw x 4 J Install Accessory 4x4 1 Work 4 x 4 into brackets as shown in Fig 14 and Fig 14a 2 Secure brackets Fig 15 Fig 15 4 x 4 x 47 1 2 Fig 14 Tip Flex brackets to...

Page 22: ...ll location marks to confirm accuracy of layout Fig 16a 3 Make certain that the holes marked at the A Frame connection are 5 1 2 apart 4 Temporarily remove Timber Glove and use a 3 8 drill bit to dril...

Page 23: ...am over so that bolt tips are facing upwards Apply Timber Wrap to 4 x 4 using the bolt tips as a guide as shown in Fig 17a Tigthly wrap TimberGlove around 4 x 4 Swing beam and using the hook and loop...

Page 24: ...st measured 2 Install the swing hanger onto the beam by sliding over two carriage bolts refer to Fig 16 for placement and apply two washers and two loc nuts per Swing Hanger Make certain to orient swi...

Page 25: ...ng towards each other 3 Align EZ Frame Bracket with face of 4 x 4 s 4 Secure EZ Frame Bracket with 8 2 1 2 screws to 4 x 4 s making sure they are flush with each other 5 Secure 2 x 4 to 4 x 4 s as sho...

Page 26: ...Frame Assembly cont 1 Align EZ Frame Bracket with carriage bolts on Swing Beam in the location shown in Fig 20 2 Attach A Frame beam to Swing Beam using 2 washers and 2 Loc Nuts and 2 screws as shown...

Page 27: ...Lag screw x 8 each bracket 22 P A Frame Assembly cont 1 Position Split Brackets on 4 x 4 x 47 1 2 Fig 21 2 With the help of others lift A Frame and Swing Beam Assembly and center onto unit as shown in...

Page 28: ...boards evenly spaced in the opening Fig 24 Use 2 1 2 screws to secure to 5 4 x 4 to 4 x 4 Fig 24 7 5 4 x 4 x 36 2 1 1 2 deck screws per joint Fig 23 3 2 1 2 screws per joint 5 4 x 4 x 47 1 2 ATTENTIO...

Page 29: ...4 barrier boards spaced to create openings as shown in Fig 26 Fig 25 5 4 x 4 x 47 1 2 5 4 x 4 x 20 3 4 5 2 1 2 screws 3 2 1 2 screws per joint 2 1 2 screw Fig 26 3 5 4 x 4 x 36 2 5 4 x 4 x 36 2 1 1 2...

Page 30: ...27 2 Install 2 x 4 barrier boards spaced to create openings as shown in Fig 28 Fig 27 5 4 x 4 x 47 1 2 3 2 1 2 screws per joint Fig 28 2 x 4 x 36 2 1 1 2 deck screws per joint 32 1 4 2 1 2 screw 2 x 4...

Page 31: ...uctions T Picnic Deck Area 1 Install 2 x 4 boards as shown in Fig 29 2 Install 2 x 4 board as shown in Fig 30 Fig 29 2 x 4 x 47 1 2 4 2 1 2 Screws per joint Fig 30 2 x 4 x 37 2 2 1 2 screws per joint...

Page 32: ...x 4 board as shown in Fig 31 2 Install 5 4 x 4 deck boards as shown in Fig 32 Fig 31 2 x 4 x 47 1 2 2 2 1 2 screws per joint Fig 32 2 5 4 x 4 x 40 1 4 2 1 2 screw 10 5 4 x 4 x 47 1 2 5 4 x 4 x 34 17 3...

Page 33: ...4 x 4 boards as shown in Fig 33 2 Install 5 4 x 4 board as shown in Fig 34 Fig 33 5 4 x 4 x 47 1 2 3 2 1 2 Screws per joint Fig 34 5 4 x 4 x 47 1 2 2 1 2 screw 5 4 x 4 x 47 1 2 5 4 x 4 x 47 1 2 24 3...

Page 34: ...rd as shown in Fig 35 2 Install 1 x 5 Table Boards as shown in Fig 35a Fig 35 2 1 1 2 deck screws per joint 12 5 4 x 4 x 23 3 4 Fig 35a 2 1 1 2 deck screws per joint 1 x 5 x 31 3 4 Slant Cut 1 x 5 x 2...

Page 35: ...cond A Frame 2 Using two 2 A Frames and four 4 47 1 2 long Roof Slats build wood roof as shown in Fig 36a Fig 36 2 x 4 x 44 3 4 2 x 4 x 41 1 4 6 1 1 2 deck screws per side Fig 36a X 2 6 1 1 4 deck scr...

Page 36: ...ort Boards evenly spaced underneath the wood roof as shown in Fig 39 Make certain to place screws through thickest portion of Roof Slats near the bottom seam as shown in Fig 39a Fig 37 Fig 38 Fig 39 3...

Page 37: ...washer washer 1 3 4 Panhead screw 1 3 4 Panhead screw 1 3 4 Panhead screw AA Play Handles 1 Mount Play Handles in the Rock Wall opening approximately 11 above the deck surface Fig 40 2 Reference page...

Page 38: ...asily Mount rocks per attached instructions as shown in Fig 42 4 Attach the Rock Wall to the unit as shown in Fig 41b and Fig 41c Fig 41a Fig 41b 2 2 1 2 screws per joint 2 1 2 screw 3 2 1 2 screws pe...

Page 39: ...e clear of wall supports before drilling 2 Drill holes through the wall at the desired locations using a 3 8 drill bit Install Climbing Rocks as shown in the appropriate diagram 3 Make sure the Climbi...

Page 40: ...ctions 14 Z Install Decorative Arch Boards 1 Secure decorative 5 4 Center Arch boards on both sides of unit as shown in Fig 43 2 1 2 screw Fig 43 5 4 x 4 x 47 1 2 Center Arch 3 2 1 2 screws 3 2 1 2 sc...

Page 41: ...sing 1 5 16 x 3 4 head bolt 1 5 16 loc nut and 2 5 16 flat washers at each location See Fig 44a and Fig 44b for proper hardware application 2 Position slide to determine proper location for stake 3 Dr...

Page 42: ...djacent to the base and near the corners of your activity center at the bottom of the legs on swing sets and twist the auger style stakes into the ground until only the loop is exposed 3 Place the met...

Page 43: ...to secure the bottom of each Pirate s Ladder rope Tap two staples in place approximately 1 apart Wrap the rope under the 2 x 4 Then thread the rope through both staples Double the rope back on itself...

Page 44: ...t Cover 1 1 4 screws Loc Nut Washer GG Install Disc Swing 1 Attach the rope to the swing beam by slipping the eye bolt through the hole and secure it with a 3 8 flat washer and loc nut 2 Place a bolt...

Page 45: ...45 PB 8228 PB 8205 Assembly Instructions...

Page 46: ...46 PB 8228 PB 8205 Assembly Instructions...

Page 47: ...47 PB 8228 PB 8205 Assembly Instructions...

Page 48: ...PlayCore Inc 2008 Printed In USA LA 5522 Questions Call our Customer Service Department at 1 800 888 1232...

Reviews: