Swing-N-Slide PB 8140 Assembly Instructions Manual Download Page 16

16

Assembly Instructions

Fig. 7  

 1-1/2"

7-1/2"

17-3/8"

33-3/8"

43-1/4"

59-1/4"

69-1/8"

85-1/8"

Attach This End  To Playset

 1-1/2 "

6"

9-7/8"

16"

9-7/8"

16"

9-7/8"

16"

10-7/8"

9

6

"

1-3/4"

3-1/2"

PLAYSET

3/8'' Hole Locations

A-Frame

RING TRAP

SWING

SWING

3-1/2

''

Swing Beam Drill Locations:

1.

Use a 3/8'' drill bit to drill a 3/8’’ hole through the beam at each location shown in 

(Fig. 7)

.

2. 

Tap T-Nuts into the swing beam at the locations shown in 

(Fig. 7)

.

3. 

Install Swing Hangers onto swing beam at locations shown, as shown in 

(Fig. 7)

and 

(Fig. 8)

.

Note:

Swing Hangers must be installed on the same side dimensions were originally marked.

W

O

O

D

 G

U

A

R

D

 4

'' 

x

 4

'' 

x

 9

6

''

ElEcTRIc DRIll

3/8" DRIll bIT 

(6'' Min.)

Dri

ll 3

/8''

Ho

le

Sw

in

Be

am

TOP VIEW 

Summary of Contents for PB 8140

Page 1: ...swing n slide com Other benefits include information on product warranties assembly plan updates joining our mailing list for new products and promotions receiving our newsletter and providing feedbac...

Page 2: ...mb on the equipment when it is wet Be sure to go down slides feet first Determined that only one child per planned occupant seat should be allowed on this set at one time Determined children must be d...

Page 3: ...5 YEAR LIMITED WARRANTY Swing N Slide warrants its No Cut and Wood Complete Ready to Assemble Play Set kits against wood rot and termite damage and to be free from defects in workmanship and material...

Page 4: ...NTER s sQUARE TOOLS REQUIRED 1 T30 Torx Bit 1 T20 Torx Bit 4 2 1 2 Panhead Screw 90 1 1 4 Wood Screw 38 2 Wood Screw 212 2 1 2 Wood Screw 22 1 1 4 Lag Screw 42 2 Lag Screw 4 1 1 2 Lag Bolt 6 Tarp Wash...

Page 5: ...8140 Plan 1 Plan 4 Anchor It Straps 4 Anchor Its 5 1 Playful Chalet Tarp 1 Chalk Board 4 Shelf Loc 1 LH Split Beam bracket 1 RH Split Beam bracket 6 Wrap Loc 2 3X3 TO 4X4 Shelf Loc 2 Abrazaderas EZ Fr...

Page 6: ...GES 2 10 YEARS For Home Residential Use ONLY 1212 Barberry Drive Janesville WI 53545 1 800 888 1232 www swing n slide com R 1 ID Tag 2 Swing Seat weight limit 115 lbs 2 Seats 4 V hangers 4 22 Uncoated...

Page 7: ...x 24 PF 3629 2 5 4 x 4 x 27 PF 3630 1 5 4 x 4 x 47 PF 3631 3 5 4 x 4 x 47 1 2 PF 3632 2 1 1 2 x 3 x 47 1 4 PF 3633 2 1 1 2 x 3 x 94 PF 3634 1 2 x 4 x 3 1 2 PF 3635 1 2 x 4 x 17 1 4 PF 3419 3 2 x 4 x 4...

Page 8: ...hen mounting 1 x 4 boards to 1 x4 boards How to select the correct fastener Use these 2 pictorial guides to help select the correct fastener s for the lumber attachment you are making Each diagram wil...

Page 9: ...rackets clip Together brackets NOT interlocked brackets clipped Example of a Shelf Loc bracket connection TOP Look for TOP stamp on bracket for correct orientation DO NOT UsE lAG scREWs HERE Use Lag S...

Page 10: ...hts as shown in Fig 1a Fig 1 1 1 2 x 3 x 47 1 4 PF 3633 2 1 2 Wood Screw 8 2 1 2 screws per board Frame 1 x2 1 1 2 x 3 x 94 PF 3634 FLUSH Fig 1a Look for TOP stamp on brackets while installing TOP GAP...

Page 11: ...1 2 2 Lag Screw Look for TOP stamp on brackets while installing TOP GAP on this side 2 1 1 4 Lag Screws per joint DO NOT UsE lAG scREWs HERE Use Lag Screws Only Where Brackets Attach DO NOT UsE lAG s...

Page 12: ...wer screws are 3 2 Lag Screws Fig 3b Fig 3d 2 1 1 4 Lag 3 2 Lag Double check to make sure structure is square 1 x 4 x 47 1 2 PF 3623 1 x 4 x 47 1 2 PF 3623 1 x 4 x 47 1 2 PF 3623 1 x 5 x 47 1 2 PF 362...

Page 13: ...1 and Frame 2 as shown in Fig 4a 2 1 2 Wood Screw 2 Wood Screw Fig 4a 3 2 1 2 screws per joint 3 2 1 2 screws per joint 3 2 1 2 screws per joint 3 2 screws per joint 1 x 5 x 30 PF 3625 1 x 5 x 30 PF 3...

Page 14: ...s as shown in Fig 5 2 Attach Deck Boards as shown in Fig 5a Fig 5 Fig 5a 2 1 2 Wood Screw 2 2 1 2 screws per joint 1 x 4 x 23 1 2 PF 3617 1 x 4 x 23 1 2 PF 3617 2 2 1 2 screws per joint 2 1 x 4 x 23 1...

Page 15: ...Swing Beam Support as shown in Fig 6 and Fig 6a 2 Lag Screw ATTENTION Unit has been rotated 1 4 turn counter clockwise for this view Tip Flex brackets to make installation of 4 x 4 easier Fig 3a Appr...

Page 16: ...m Drill Locations 1 Use a 3 8 drill bit to drill a 3 8 hole through the beam at each location shown in Fig 7 2 Tap T Nuts into the swing beam at the locations shown in Fig 7 3 Install Swing Hangers on...

Page 17: ...n Step 2 3 Insert the swing hanger into the beam and thread it into the T nut until it is flush or near flush with the top of the T nut A screwdriver may be used to twist the hanger Orient the Beam Cl...

Page 18: ...lign EZ Frame Bracket with face of 4 x 4 s 3 Secure EZ Frame Bracket with 8 2 1 2 screws to 4 x 4 s making sure they are flush with each other 4 Secure 2 x 4 to 4 x 4 s as shown in Fig 9a 5 Flip over...

Page 19: ...screws Hex Bolt Washer 3 1 2 Hex Bolt A Frame Assembly cont 1 Attach A Frame to Swing Beam using 2 hex bolts and 4 screws as shown in Fig 10 2 Tighten hex bolt to flush with top of T nut Repeat on se...

Page 20: ...w from Deck 2 Lag screw x 8 each bracket Swing Beam Fig 11a A Frame Assembly cont 1 With the help of others lift A Frame and Swing Beam Assembly and center onto unit as shown in Fig 11 2 Secure Swing...

Page 21: ...Support Boards as shown in Fig 12 2 Install 4 Barrier Boards as shown in Fig 12a Fig 12a Fig 12 2 1 2 Wood Screw 2 2 1 2 screws 4 places 10 7 8 1 1 4 Wood Screw 4 1 x 4 x 30 PF 3619 2 1 1 4 screws per...

Page 22: ...1 Barrier Support Board as shown in Fig 13 2 Install Chalk Board as shown in Fig 13a Fig 13 Fig 13a 1 1 4 Wood Screw 1 x 4 x 41 1 2 PF 3622 2 1 1 4 screws per board FLUSH Chalk Board PF 2982 1 1 2 1 7...

Page 23: ...ttach Barrier Support Board as shown in Fig 14 2 Attach Barrier Boards as shown in Fig 14a Fig 14a Fig 14 1 x 4 x 12 3 4 PF 3613 2 1 2 Wood Screw 1 1 4 Wood Screw 2 1 x 4 x 30 PF 3619 Evenly Space Bar...

Page 24: ...0 PF 3619 4 1 x 4 x 30 PF 3621 Barrier Assembly 1 Attach Barrier Support Board as shown in Fig 15 2 Attach Slide Support Board as shown in Fig 15a 3 Attach Barrier Boards as shown in Fig 15b Fig 15 2...

Page 25: ...e as shown in Fig 16b 4 Attach Roof Assembly as shown in Fig 16c Fig 16 Fig 16a Fig 16b Fig 16c 3 4 Pan Head screw Washer 3 Per Side 3 4 Screw 2 1 2 Wood Screw 8 1 1 4 screws 1 1 4 Wood Screw x2 2 2 1...

Page 26: ...n in Fig 17b and Fig 17c Fig 17 Fig 17a 2 1 2 Wood Screw 1 1 4 Wood Screw 2 2 1 2 screws per joint 5 4 x 3 1 2 x 47 PF 3631 11 3 8 2 1 x 4 x 15 3 8 PF 3615 1 x 4 x 11 3 8 PF 3611 38 1 2 43 5 8 3 Ladde...

Page 27: ...screws to to secure slide to deck Slide Installation 1 Install Slide centered in the provided opening as shown in Fig 18 2 Attach Stake to end of slide as shown in Fig 18a 1 1 4 Wood Screw Fig 18a 2...

Page 28: ...esville WI 53545 1 800 888 1232 www R 1 2 Pan Head screw Fig 19a ID TAG 1 Secure your product ID tag onto easy to read location of any 4 x 4 using 2 1 2 Pan Head Screws as shown in Fig 19a Name Plate...

Page 29: ...ers of your activity center at the bottom of the legs on swing sets and twist the auger style stakes into the ground until only the loop is exposed 3 Place the metal strap through the loop of the Anch...

Page 30: ...30 Assembly Instructions...

Page 31: ...31 Assembly Instructions...

Page 32: ...PlayCore Inc 2014 Printed In USA LA 7132 Questions Call our Customer Service Department at 1 800 888 1232 R...

Reviews: