![Swing-N-Slide PB 8137 Assembly Instructions Manual Download Page 11](http://html.mh-extra.com/html/swing-n-slide/pb-8137/pb-8137_assembly-instructions-manual_1414295011.webp)
11
STEP 2
1. Assemble Frame B as shown.
Note:
Tap each T-Nut into its pre-drilled hole until the metal tangs sink fully into the wood.
2-1/2” Deck Screw (x10)
PF 4866
2’’x4’’x24’’
PF 4854
1’’x4’’x24’’
Flush
5/16-18 X 2-3/4’’ Hex Head Bolt
5/16’’ Loc-Washer
5/16’’ Washer
T-Nut
Large
FRAME B
Flush
PF 4863
5/4’’x4’’x24’’
1-1/2” Deck Screw (x6)
(3)
2-1/2’’ Screws
Per Joint
PF 4869
2’’x4’’x85-1/2’’
PF 4869
2’’x4’’x85-1/2’’
(3)
1-1/2’’ Screws
Per Joint
(2)
2-1/2’’ Screws
PRE-DRILL
BOARDS TO
MINIMIZE
SPLITTING