11
PROJECT 512
2'' Lag screw
Frame
2
Frame 2
B. Frame 2 Construction
1.
Measure and position brackets on 4'' x 4'' x 120’’ as shown in
(Fig.2)
.
2.
Attach upper 2'' x 4'' and lower 5/4'' boards as shown in
(Fig. 2)
Note:
Secure Shelf Lock with
(2) Lag Screws only
at this time.
Fig.2
2'' x
4'' x
54''
5/4''
x 6''
x 54''
Frame 2 Construction
86''
48''
(3)
2-1/2'' screws
(3)
2-1/2'' screws
(2) 4'' x 4'' x 120''
59''
47''
(2)
2'' lag screws
per bracket
2-1/2'' screw
Summary of Contents for Kodiak PROJECT 512
Page 35: ...35 PROJECT 512 Fig 29...