background image

Summary of Contents for JAMBOREE

Page 1: ...LY Please make sure all lumber hardware and accessory parts are accounted for If you are missing anything please DO NOT RETURN to the store where purchased Please call our Customer Service Department...

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ...DIMENSIONS STRUCTURE...

Page 6: ...TOOLS REQUIRED DRILL HAMMER TAPE MEASURE PHILLIPS BIT CARPENTER SQUARE INCLUDED HARDWARE Small Square Bit PLIERS...

Page 7: ...7 HARDWARE 1 1 3 7 4 2 4 1 2 1 12 Small...

Page 8: ...SA6066 BOX 1 of 2 BOARD LIST...

Page 9: ...9 SA6065 BOX 2 of 2 BOARD LIST...

Page 10: ...COMPONENTS...

Page 11: ......

Page 12: ...TEP 1 PANEL A PANEL B PANEL C Check to make sure structure is square Per Board Per Board Per Board NOTE HOLES Install 30mm Screws With Heads Flushed To Board To Avoid Protrusions Per Board Flush Flush...

Page 13: ...2 PANEL D Check to make sure structure is square PANEL E ALL BOARDS FLUSH FLUSH Per Board Per Board Per Board Per Board Per Board Install 30mm Screws With Heads Flushed To Board To Avoid Protrusions F...

Page 14: ...T Nut into its pre drilled hole until the metal tangs sink fully into the wood Flush Flush Flush Flush NOTE HOLE ORIENTATION PANEL C NOTE HOLES T Nut Small T Nut Small Check to make sure structure is...

Page 15: ...STEP 4 FLIP FRAME OVER FRAME A...

Page 16: ...e per Board This Side Note Tap each T Nut into its pre drilled hole until the metal tangs sink fully into the wood FRAME B WINDOW PANE INSTALL NOTE HOLE ORIENTATION NOTE HOLE T Nut Small T Nut Small C...

Page 17: ...STEP 6 FLIP FRAME OVER FRAME B...

Page 18: ...ost Flush Flush PANEL A 94 1 4 NOTE HOLE Check to make sure structure is square Side View of Tower 3 From outside of post To end of horizontal support PF 6338 Flush to outside edge of 3 x 3 PANEL A Fl...

Page 19: ...STEP 8 FRAME B FRAME A Flush Flush 19 1 2 Side View of Tower 3 From Outside of Post to End of Horizontal Support...

Page 20: ...STEP 9 NOTE PRE DRILL HOLES GOING INTO DECK SUPPORTS per side 11 11 Top View of Tower Back of Tower per side Flush Flush 55 1 4...

Page 21: ...STEP 10 per board PANEL B Flush PANEL B INSTALL per joint Flush Flush...

Page 22: ...STEP 11 T Nut Small 46 5 8...

Page 23: ...STEP 12 HEADS FLUSH T Nut Small...

Page 24: ...STEP 13 FRAME C 46 5 8 45 TO HOLE Flush Flush Flush Flush Flush Flush Flush Flush Flush Flush Flush Flush FLIP FRAME OVER NOTE HOLES Check to make sure structure is square PANEL E...

Page 25: ...STEP 14 Note Tap each T Nut into its pre drilled hole until the metal tangs sink fully into the wood T Nut Small LIFT FRAME UP...

Page 26: ...STEP 15 Check to make sure structure is square Flush Flush FRAME C...

Page 27: ...STEP 16 per joint Check to make sure structure is square Flush Flush Inside View of Tower Flush 77 1 4 PANEL D...

Page 28: ...PRE DRILL SUPPORTS STEP 17 Flush Flush per board per board Top View of Terrace 12 3 4 12 3 4...

Page 29: ...STEP 18 Flush per board...

Page 30: ...STEP 19 Flush Flush Flush 2 1 4...

Page 31: ...STEP 20 Flush 26...

Page 32: ...STEP 21 Loc Nut Attach Tower Beam Support Board as shown...

Page 33: ...STEP 22 Swing Beam Large 1 Screws Hanger Correct Orientation 2 4 5 Beam Clamp 3 x4...

Page 34: ...STEP 23 A Frame A Frame SB Support A Frame Support Small Small Small...

Page 35: ...STEP 24 Bracket x2 x2...

Page 36: ...STEP 25 Beam Brace Small Barrier Boards Removed for Clarity...

Page 37: ...STEP 26 Carriage Bolt Small Barrier Boards Removed for Clarity...

Page 38: ...STEP 27 NOTE Overlap Shingles as shown CENTERED Screws Screws per board Screws per board Screws Screws Screws Screws x2 x2 x2 Front View Screws Flush...

Page 39: ...Flush Flush Screws per board Screws per board per board Screws per board Screws per board Cutaway View 1 1 2 FLUSH AT BOTTOM 1 1 2 OUTSIDE TO OUTSIDE OUTSIDE TO OUTSIDE OUTSIDE TO OUTSIDE CENTER TO OU...

Page 40: ...STEP 29 Screws Screws Screws per board Screws Screws...

Page 41: ...STEP 30 Screws per board Screws Per side Side View Top Flush Flush ALIGN SCREWS WITH PRE DRILLS...

Page 42: ...STEP 31 Screws Side View Bottom Flush...

Page 43: ...STEP 32 Bolts...

Page 44: ...STEP 33 TABLE SUPPORT Top View of Table Inside View of Table NOTE HOLES NOTE HOLES...

Page 45: ...Note Pre Drill boards with 1 8 drill bit as shown to prevent splitting Check to make sure structure is square Flush Flush BOTH SIDES TABLE BOTH SIDES PRE DRILL BOARDS WITH 1 8 DRILL BIT TO MINIMIZE SP...

Page 46: ...STEP 35 Flush Flush SUPPORT Make Certain This Side Has Holes Closest To The Edge per side TO BOTTOM OF SUPPORT TO BOTTOM OF SUPPORT...

Page 47: ...STEP 36 per side...

Page 48: ...STEP 37 FLAP ON THE UNDERSIDE FLAP ON TOP CENTERED FLAP DOWN FLAP UP per joint...

Page 49: ...STEP 38 Slide Stake Screws ATTACH SLIDE INTO...

Page 50: ...STEP 39 Pan Screw...

Page 51: ...STEP 40 1 3 4 2 NOTE Crimp swing hanger tightly closed Ring Trap Combo Assembly Attach Quick Link to chain oriented as shown...

Page 52: ...STEP 41 Swing Seat Assembly BOTTOM OF SEAT BOTTOM OF SEAT...

Page 53: ...ing Wheel and drill a 5 16 diameter hole through the lumber NOTE If lumber is greater than 2 in depth you will need to counterbore the hole appropriately 2 Mount Steering Wheel to climbing unit as ind...

Page 54: ...STEP 43 Flag Assembly Telescope Assembly STEP 44 Per Flag Telscope Assembly Mounting Screw Mounting Bracket...

Page 55: ...ttle play as possible using any of the holes in the strap that work best TIP Drill Bit or a long screw driver then insert and install the Anchor Its as shown This will allow you to get traction with t...

Page 56: ...These items to be free from defects in workmanship and materials under normal use Swing N Slide will repair or at its discretion replace any part within the stated warranty period which is defective i...

Page 57: ...ter online to properly initiate your product warranty registration Quick simple from home or mobile Record your purchase in our system Initiate product warranty Improved customer support Register your...

Page 58: ...Printed in USA Call our Customer Support Representatives...

Reviews: