![Swegon GOLDen GATE Lonworks FTT-10 Installation Manual Download Page 3](http://html1.mh-extra.com/html/swegon/golden-gate-lonworks-ftt-10/golden-gate-lonworks-ftt-10_installation-manual_1413452003.webp)
GB.TBLZ41.160408
Registered design. The company reserves the right to make design changes without prior notice.
www.swegon.com 3
3. Installation
3.1 GOLD, Version E/F
Place the communication unit on the DIN rail inside the
electrical equipment cubicle of the air handling unit or
inside an optional enclosure.
Connect the 24 V AC supply voltage to terminals Vin+
(24) and GND (23). Supply voltage can be obtained from
the control unit of the air handling unit, see below and B
in Fig. 4.
GOLDen GATE
GOLD
Terminal 24 (Vin+)
Terminal 31 (G)
Terminal 23 (GND)
Terminal 32 (G0)
Connect the network from the GOLDen GATE communi-
cation unit to the control unit of the GOLD (A in Fig. 4).
Use a 3-wire cable.
GOLDen GATE
GOLD
Terminal 1 (A)
Terminal 1 (A)
Terminal 2 (B)
Terminal 2 (B)
Terminal 3 (Not used)
Terminal 4 (GND)
Terminal 3 (GND)
The DIL switch must be in the ON position (see Fig. 1, Item
5).
Connect the Lonworks-network to the communication
unit, NET A (terminal 18 or 20), NET B (terminal 17 or 19)
and shield, if required, to SHLD (terminal 21).
Communication between the communication unit and the
air handling unit is activated by choosing LON in the hand-
held terminal under Functions/Communication/EIA-485.
See also the Operating and Maintenance Instructions for
the GOLD.
Fig. 4
SD
WLAN
CPU 1
CPU 2
1
A
2
B
3
GND
4
+
5
-
6
+
7
-
8
+
9
-
10
+
11
-
12
+
13
-
SA Temp
Com 5
Com 4
Com 3
Com 2
Com 1
14
+
15
-
16
+
17
-
18
+
19
-
Heat
Cool
20
C
21
NO
22
C
23
NO
24
C
25
NO
26
C
27
NO
28
P
29
G
30
G0
31
G
32
G0
24V AC
Sensor 1 Sensor 2
Sensor 4
Sensor 3
Com 6
Com 7
Com 8
Com 9
Com 10 Com 11
+
33
-
34
G
35
G0
36
Y
37
U
38
39 40
24V AC In
41 42
18V AC In
45 46
230V AC In
47
43 44
230V AC Out
B
A