![Swegon ELQZ-2-504 series Installation Instructions Download Page 2](http://html1.mh-extra.com/html/swegon/elqz-2-504-series/elqz-2-504-series_installation-instructions_1413362002.webp)
GB.ELQZ504480.110202
Specifications are subject to alteration without notice.
2 www.swegon.com
4. Technical Data
Supply voltage
24 V AC ± 20%
Frequency
50/60 Hz
Power consumed
3 W
Output signal
0–10 VDC
Measuring range
500–1500 ppm
Accuracy*
± 1% of the measuring range
± 5% of the reading
Warm-up period
< 1 min.
Response time
< 2 min.
Wiring nuts
for max. 1,5 mm²
Enclosure Class IP 20
Operating temperature 0 till +50 °C
Storage temperature -20 till +70°C
Dimensions (H×W×D) 120×82×30
*The accuracy is defined for continuous operation (at least three weeks
after installation).
5. Secure the base plate by means of screws to the wall.
The screw head should be max. 4 mm.
A
B
6. A Insert the hooks into the holes in the upper
section of the base plate.
B
Press the front against the base plate until its
hooks lock into the bottom edge of the front.
7. Push in the top section under the locking hooks in the
base plate and secure it in position by means of the screw.