Swegon ADAPT Extract d Installation, Commissioning Maintenance Download Page 1

1

ADAPT

TM

 

Extract d

Installation – Commissioning – Maintenance

20130610  /  Art. No. 1545218

Installation

1. The commissioning box can be suspended from a 

ceiling and connected to a duct system. Use hanger 
system (A) or (B), see figure 2.

2. Plug the connector of the commissioning box into the 

top of the diffuser (C, figure 2). The front plate does 
not normally need to be removed when plugging the 
connector in the diffuser. 

3. Mount the diffuser into the outlet of the commission-

ing box. Make sure that the orientation of the sensor 
module aligns with the extension of the room, see figure 1. 

4. Fixate and secure the diffuser with screws or pop rivets. 

Readjust the hanger rods of the commissioning box if 
necessary, so that the air diffuser is firmly positioned 
against the false ceiling. 

A

B

C

Pins

insulation

Figure 2. ADAPT Extract, installation.

Figure 1. The orientation of the sensor module in a room or in 
an office module. The LED’s of the sensor should be aligned with 
the extension of the room in a straight line, facing the short sides 
of the room as shown by the arrow in the figure.

Disassembly of the front plate

1. Dismantle the front plate from the diffuser body by 

turning the three springs which enables separation of 
the front plate from the pins of the diffuser.

2. When re-installing the front plate, position the three 

springs to the match the same rungs as on delivery.