05OCT09
ADDITIONAL NOTES:
1. Prior to any welding, consult the
truck manufacture for any special
precautions that may need to be
taken. Typically the batteries must be
disconnected and the ground lead
from the welder should be as close to
the part being welded to avoid the
possibility of arcing across bearings,
gears, etc.
2.
All welds should be done utilizing a
low hydrogen welding process.
INSTALLATION INSTRUCTIONS (continued)
5.
Weld the bumper weldment to the vertical channels (See Fig. 1 & 3).
FIG. 2
FIG. 3
1
2
TRUCK FRAME
(REF)
MATERIAL LIST
ITEM
QTY
P/N
DESCRIPTION
WT lb.
PER EA.
1
1
52H12
REAR BUMPER WDMT
95.66
2
2
63H94
VERTICAL CHANNEL
9.58
3
1
52H13
REAR BUMPER EXTENSIONS
58.42
TOTAL 173.24
REAR BUMPER ASS’Y w/ EXTENSIONS
(52H11 with 52H13 Extensions)
3
1800 NE Broadway Avenue, Des Moines, Iowa, U.S.A. 50313-2644
Phone: (515) 266-3042
•
Fax: (515) 313-4426
•
Toll Free: (888) 767-8000
E-Mail: [email protected]
•
Web Site: www.swaploader.com
Summary of Contents for SL-145
Page 1: ...Model SL 145 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 7: ...INTRODUCTION ...
Page 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 15: ...INSTALLATION ...
Page 38: ......
Page 39: ......
Page 42: ...Page 3 of 7 28JUL09 ...
Page 43: ...Page 4 of 7 28JUL09 ...
Page 44: ...Page 5 of 7 28JUL09 ...
Page 45: ...Page 6 of 7 28JUL09 ...
Page 46: ...Page 7 of 7 28JUL09 ...
Page 49: ......
Page 50: ......
Page 51: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 54: ...10 05 09 ...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 61: ...OPERATION ...
Page 66: ...MAINTENANCE ...
Page 68: ...SL 145 MAI 4 2 07 2009 ...
Page 80: ...PARTS LIST ...
Page 81: ...11H80 REV B SL 145 SWAPLOADER HOIST BASE ASS Y 2 1 5 2 3 3 1 ...
Page 83: ......
Page 84: ......
Page 92: ...OPTIONS ...