A-96.250.211 / 171121
AMI Sodium P
Maintenance
81
6.11.2 Replacing the Reaction Tube
1
Release SERTO fitting nuts [A].
2
Remove the sealing elements [B] from the reaction tube.
3
Pull reaction tube [C] out of the flow cell cover.
4
First slide one light protecting sleeve [D] over the new reaction
tube with the plain side facing towards the flow cell cover.
5
Then push the new reaction tube through the hole in the flow cell
cover and the bubble detector.
6
Finally slide the other light protecting sleeve with the rounded
side facing towards the flow cell cover over the reaction tube.
Note:
Extraneous light may distort the bubble measurement.
Therefore it is important that there is no gap between the light
protection sleeves and the flow cell cover respectively the bubble
sensor.
7
Push the sealing elements [B] over the reaction tube.
8
Push the reaction tube into the SERTO fittings.
9
Tighten the nuts of the SERTO fittings.
A
B
C
D
E
F
Serto fitting nuts
Sealing elements
Reaction tube
Light protection sleeves
Bubble sensor
Flow cell cover
1
2
C
D
D
A
A
B
E
B
C
D
F
E