Photo1 - The jib shackled to the furling drum (5). Note the furling line running to the
furling cleat (1) and the clew line running to the clew outhaul cleat (3). The jib sheet
passes through a bullseye on the boom (2). The whole assembly is shackled to the stem
head via a rope strop (4).