2-1
Installation and Commissioning
2
Installation and Commissioning
2.1
Unpacking the Device
Unpack all parts carefully and check the contents for any visible damage in transit.
Also check whether the shipment matches the specifications on your delivery note.
If you notice damages in transit or discrepancies, please contact our sales depart-
ment immediately.
2.2
Mounting the Device
The operating device can be easily and quickly mounted from the rear of the operat-
ing device. This is particularly recommended for mounting in switchboards with a
plate thickness of approx. 1 mm to 8 mm (0.039" to 0.315").
1. Insert the operating device from the front through the mounting cutout.
2. Fasten the operating device using hexagon nuts.
When installing the operating device, keep a minimum clearance of 30 mm (1.181")
around the operating device to ensure adequate air circulation.
When the operating device is installed horizontally, please note that additional sourc-
es of heat beneath the operating device may result in heat accumulation.
Make sure to allow sufficient heat dissipation!
Comply with the allowable temperature range listed in the technical data for the use
of the operating device!
To maintain the specified degree of protection, make sure the seal is evenly seated
on the installation surface and the hexagon nuts are tightened uniformly.
Ensure that the maximum torque of 1.2 Nm is not exceeded.
Summary of Contents for TesiMon TM1500
Page 4: ...Overall Table of Contents ii...
Page 20: ...Maintenance and Servicing 5 2...
Page 24: ...A 2...
Page 25: ......