background image

Orchard Twin 

Tangle

Installation Instructions

ORW800

Page 1

Rev 03

Summary of Contents for Orchard Twin Tangle ORW800

Page 1: ...Orchard Twin Tangle Installation Instructions ORW800 Page 1 Rev 03...

Page 2: ...t sequence The main connections are secured with M16 bolts two 24mm long socket drives are required 7 Assemble the nets onto the logs in accordance with the assembly sheets Do not concrete the main lo...

Page 3: ...PU800 08 LOG OPU800 05 LOG OPU800 03 LOG OPU800 02 ORR022FA ORR024FA Ref Description Qty OPA001 Alloy Ground Fixing 750 8 ORR022FA 800 Rope Net 1 ORR023FA 800 Rope Net 1 ORR024FA 2390 Long Rope Assy 3...

Page 4: ...ORW800 Rev 03 Page 4 GROUND FIXINGS POST CAPS...

Page 5: ...Page 5 ORW800 Rev 03...

Page 6: ...ORW800 Rev 03 Page 6 NET FIXING...

Page 7: ...RS005ZP WDS450 WSR034 DESCRIPTION M16 x 120 HEX HEAD BOLT QTY 0 8 27 25 14 29 14 7 45 37 M16 x 260 HEX HEAD BOLT M10 x 80 COACH SCREW M16 NYLOC NUT TIMBER RUBBER SPACER 41 DIA RUBBER LOG PLUG ORCHARD...

Page 8: ...ORU800F Fixing Kit Rev 03 STOCK CODE CZA138ZP DESCRIPTION M16 U BOLT ZINC PLATED QTY 4 Page 8...

Page 9: ...der Rev 03 Page 9 OPU800 04 OPU800 07 OPU800 01 OPU800 06 OPU800 11 STAGE 1 STAGE 2 X ON THIS END OF LOG OPU800 01 OPU800 05 OPU800 08 OPU800 03 OPU800 02 OPU800 02 OPU800 03 OPU800 04 OPU800 05 OPU80...

Page 10: ...Orchard Post Assembly Order Rev 03 Page 10 STAGE 4 OPU800 09 X ON THIS END OF LOG OPU800 10 FIT ALL ACTIVITYS STAGE 3...

Page 11: ...ng lubricate or replace if required Check rubber parts for wear and or damage replace if required Check tension cables adjust if required Check wear of cables replace if required Check slide chutes fo...

Reviews: