Installation
SUSPA ELS3 HeavyDuty - Installation Instruction
Page 32
6.3.2.1
Assembling Lifting Elements Including the 2-Leg HeavyDuty Subframe
Assembling the top frame
Figure 11 Assembling the top frame of the 2-leg system
For the assembly of the top frame, the cross beams E and S are placed on the floor as illustrated in
Figure 11. In the next step, the fixing plates are hooked into the two cross beams E. The finally
assembled top frame is illustrated in Figure 12.
Figure 12 Assembled top frame of the 2-leg system
Top frame
Fixing plate
Cross beams E
Cross beams S
Top frame
Fixing plate
Cross beams E
Cross beams S