212031 10/19 | 85-000417_INST_D
Figure 3
Figure 4
Figure 6
Figure 5
Figure 1
Figure 2
Installation
1. Install Surly Dummy Rails according to the instructions.
2. Install the included
FreeLoader hardware kit
using the threaded bosses
located on your Big Dummy
frame (Figs 1, 2).
3. Fasten the bag-to-rail
attachment straps to the
Dummy Rails. The gap
between the top of the bag
and bottom of the rail tube
should be approximately
25mm (Figs. 3–6).
4. Attach the Lower Tensioning
Strap Assemblies to the
FreeLoader hardware on
the frame and tension
the straps
(Figs. 7, 8)
.
5. Older frames without
FreeLoader hardware
will use the Snap Hook
Strap Assemblies to tension
the bags to the frame
(Figs. 9, 10)
.
Figure 8
Figure 7
Figure 10
Figure 9