7
SC-TDC-1000 S Series Manual
SC-TDC-1000 S Series Manual | Surface Concept GmbH
3 Installation
3.1 Initial Inspection
Visual inspection of the system is required to ensure that no damage has occurred during shipping. Should
there be any signs of damage, please contact our provider immediately. Please check the delivery according
to the packing list (see
) for completeness.
• SC–TDC-1000 S (R012, R013, R022, R042)
• 1x USB cable
• 1x power cable
Table 1: Packing list for the SC-TDC-1000 S (R012, R013, R022, R042)
3.2 Cabling
The general connection scheme of the SC-TDC-1000 S devices is given in
Figure 1: General connection scheme of the SC-TDC-1000 S devices.