Technical Specifications

Materials

 

  

Steel

Connections

     

   

½" flow and return.

Test pressure

 

                         10.5 Bar

Testing authority

 

  

EN442

Maximum operating pressure

 

 8 Bar

Maximum working temperature 

95ºC 

Packaging

 

   

Plastic wrapped in cardboard box

All products must be inspected once removed 
from the packaging and your point of purchase 
notified within 28 days of delivery of any scratches, 
blemishes or other damage. Your point of purchase 
will then agree appropriate action.
Imperfect radiators should therefore not be fitted 
and we will not accept responsibility for replacement 
of scratched or damaged radiators once they have 
been fitted. This includes any consequential loss or 
cost of fitting. 
If we are not notified within 28 days of the date 
on the signed delivery note then it will be deemed 
that we have fully complied with our obligations 
and claims will not be considered. 
Failure to comply with any of the above may 
invalidate any claims. We recommend that after you 
check the product on delivery that it is stored in its 
packaging to prevent damage prior to installation, 
we cannot accept responsibility for items damaged 
after delivery.
For full details of our Terms and Conditions please 
visit www.supplies4heat.co.uk or call us on 01342 
306880.

Terms & Conditions

This product is guaranteed for 10 years. The guarantees in all cases are subject to the 
products being installed in accordance with British and or European standards as well as 
these fitting instructions. The guarantees in all cases are restricted to the free of charge 
replacement or repair of the failed product only. Our liability will under no circumstances 
extend beyond the repair or replacement of the product supplied by us. Claims for either 
labour in replacement or damage to property are not admissible. Any goods that are 
returned, in the event of a problem, will belong to us.

Guarantees & Liabilities

PLEASE NOTE: 

Systems using micro bore pipework must have adequate pressure 

and flow rates for the number and style of radiators on the system

.

www.supplies4heat.co.uk    01342 306880

A brand of                ; Italy’s leading manufacturer of design led radiators.

You should have:

•  1 Towel rail
•  4 Bracket Sleeves
•  4 Grub screws

You will need:

•  Tape measure
•  Electric drill and bits
•  Spirit level 
•  Airvent key
•  Appropriate wall fixings
•  Spanner for valves and vents

2. Contents

Using the diagrams overleaf, mark the positions for the brackets on 
the wall. The centre of the brackets are positioned 113 mm from the 
top of the collectors, and 15 mm in from each side. 

Hold up the bracket sleeve to the wall and using a suitable screw, 
slide through the bracket and into the wall plug, and secure.

If the position is correct, we suggest marking and fixing the top 
two brackets first, and then fixing the bottom brackets to ensure 
accuracy. 

3. Mark bracket positions

4. Fix Brackets

Please Note: In accordance with Part L1 2006 of 

the Building Regulations and BS7593:1992 code of 

practice for the treatment of hot water and central 

heating systems, we strongly recommend flushing 

the heating system post installation of new radiators 

and then adding the correct quantity and type of 

inhibitor for use with your radiator and system to 

prevent corrosion. Damage caused to systems not 

protected by a suitable inhibitor will not be covered 

by manufacturer’s guarantee.

5. Commission Radiator

Please refer to the diagrams overleaf.

Cleaning: 

Steel products can be cleaned using a soft damp cloth with 
a non abrasive cleaning product. 

1

2

3

4

Using suitable drill bits and plugs fit the wall plugs into the 

wall to your previously made position markings.

Hold up the bracket sleeve to the wall, and using a suitable 

screw or the one provided, slide through the bracket and 

into the wall plug, and secure. 

Repeat above steps for both top brackets. 

Slide the towel rail into the brackets and check the positions 

using a spirit level to ensure it is horzontally level. 

If the positions is correct, repeat Section 3 and steps 1-3 

for the two bottom brackets. 

With all four bracket sleeves securely fixed to the wall, 

lift the towel rail and slide into the bracket sleeves. Use 

the supplied grub screw to insert into the side of the 

bracket sleeve, and tighten to secure. 