![Supero SuperWorkstation 7044A-8 User Manual Download Page 23](http://html1.mh-extra.com/html/supero/superworkstation-7044a-8/superworkstation-7044a-8_user-manual_1405042023.webp)
Chapter 2: Server Installation
2-7
Figure 2-4. Installing the Server into a Rack
Installing the Server into the Rack:
You should now have rails attached to both the chassis and the rack unit. The
next step is to install the server into the rack. You should have two brackets in
the rack mount kit. Install these first keeping in mind that they are left/right
specific (marked with "L" and "R"). Then, line up the rear of the chassis rails with
the front of the rack rails. Slide the chassis rails into the rack rails, keeping the
pressure even on both sides (you may have to depress the locking tabs when
inserting).
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that
hold the front of the server to the rack (see Figure 2-4).
Summary of Contents for SuperWorkstation 7044A-8
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERWORKSTATION 7044A 82 7044A 8 7044A i2 7044A i Manual...
Page 30: ...3 4 SUPERWORKSTATION 7044A 82 7044A 8 7044A i2 7044A i Manual Notes...
Page 92: ...7 24 SUPERWORKSTATION 7044A 82 7044A 8 7044A i2 7044A i Manual Notes...
Page 98: ...A 6 SUPERWORKSTATION 7044A 82 7044A 8 7044A i2 7044A i Manual Notes...
Page 124: ...C 4 SUPERWORKSTATION 7044A 82 7044A 8 7044A i2 7044A i Manual Notes...