2-8
A
+ SE
R
VER 1022G-NTF User's Manual
2-6 Checking the Serverboard Setup
After you install the 1022G-NTF in the rack, you will need to open the top cover
to make sure the serverboard is properly installed and all the connections have
been made.
Accessing the Inside of the System
1. First, grasp the two handles on either side and pull the system straight out
until it locks (you will hear a "click").
2. Depress the two buttons on the top of the chassis to release the top cover
(1).
3. Push the cover away from you (toward the rear of the chassis) until it stops
(2). You can then lift the top cover from the chassis to gain full access to the
inside of the server. See Figure 2-5.
4. To remove the system from the rack completely, depress the locking tabs in
the chassis rails (push the right-side tab down and the left-side tab up) to
continue to pull the system out past the locked position.
Checking the Components
1. You may have one or two processors already installed in the serverboard.
Each processor needs its own heatsink. See Chapter 5 for instructions on
processor and heatsink installation.
2. Your server system may have come with system memory already installed.
Make sure all DIMMs are fully seated in their slots. For details on adding
system memory, refer to Chapter 5.
3. If desired, you can install add-on cards to the system. See Chapter 5 for
details on installing PCI add-on cards.
4. Make sure all power and data cables are properly connected and not blocking
the chassis airflow. See Chapter 5 for details on cable connections.