Chapter 4: Installing the Switch
Task 4: Verify Switch Operation
Verify basic switch operation by checking the system LEDs (
When operating normally, the PSU1/PSU2, Diagnostic, and Fan LEDs should all be on
green. If any of the LEDs are on amber, see
Section 8-1: "Diagnosing LED Indicators"
.
Go to the section
Section 7-1: "Understanding the System Status LEDs" on page 7-1
.
Figure 4-3. System LEDs
System
Status LEDs
Summary of Contents for SSE-X3348T
Page 1: ...SSE X3348T and SSE X3348TR 48 Port 10G Top of Rack Switches Installation Manual Revison 1 0 ...
Page 6: ...SSE X3348T SSE X3348TR Switch Installation Manual vi Notes ...
Page 10: ...SSE X3348T SSE X3348TR Switch Installation Manual x Notes ...
Page 14: ...SSE X3348T SSE X3348TR Switch Installation Manual 1 4 Notes ...
Page 32: ...SSE X3348T SSE X3348TR Switch Installation Manual 2 18 Notes ...
Page 42: ...SSE X3348T SSE X3348TR Switch Installation Manual 4 6 Figure 4 2 Connecting AC Power 1 2 ...
Page 50: ...SSE X3348T SSE X3348TR Switch Installation Manual 4 14 Notes ...
Page 61: ...5 11 Chapter 5 Making Network Connections ...
Page 65: ...SSE X3348T SSE X3348TR Switch Installation Manual 6 4 Notes ...
Page 72: ...SSE X3348T SSE X3348TR Switch Installation Manual 8 3 ...
Page 74: ...SSE X3348T SSE X3348TR Switch Installation Manual ...