SC846 Chassis Manual
5-2
5-3 Warnings and Precautions
Rack Precautions
•
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
•
In single rack installations, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure that the rack is stable before extending a component from
the rack.
•
Only one chassis should be extended from the rack at a time. Extending two or
more chassis simultaneously may cause the rack to become unstable.
•
When initially installing the server to a rack, test that the rail locking tabs engage
to prevent the server from being overextended. Have a rack lift in place as a
precaution in case the test fails.
•
In any instance of pulling the system from the rack, always use a rack lift and
follow all associated safety precautions.
General Server Precautions
•
Review the electrical and general safety precautions that came with the
components you are adding to your chassis.
•
Determine the placement of each component in the rack
before
you install the
rails.
•
Install the heaviest server components on the bottom of the rack first, and then
work upward.
•
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
•
Allow the hot-swappable hard drives and power supply modules to cool before
touching them.
•
Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
Summary of Contents for CSE-846BE1C-R1K23B
Page 8: ...viii SC846 Chassis Manual Notes ...
Page 32: ...2 20 SC846 Chassis Manual Notes ...
Page 38: ...Sc846 Chassis Manual 3 6 Notes ...
Page 72: ...SC846 Chassis Manual 4 34 Notes ...
Page 82: ...SC846 Chassis Manual A 2 Notes ...
Page 120: ...C 26 SC846 Chassis Manual Notes ...