background image

Arch and Square Top Trellis Assembly Instructions

Determine the location of the trellis in your garden and drive ground anchors in place 25 3/4” outside to outside. Posts should be plumb and can be permanently installed with concrete.

Arrange the 

components of each 

side wall on a clean 

flat surface. The 

interior of the wall can 

best be assembled 

by inserting the three 

vertical rods into 

the bottom rail first, 

followed by the shorter 

cross piece, then the 

middle.

Finish dowel tops with 

caps.

After finishing sub-assembly, insert rails into the side 

posts.

Using the screws with snap caps, secure the interior 

sub-assembly to the side posts. Put a cap on each 

screw used. When side walls are completed, carefully 

slide posts over ground anchors.

For Arch Top Trellis: Join the two arch sub-assemblies 

together using the connector shown above. Connectors 

are included with each kit.

For Arch Top Trellis: With the same type of connector 

used previously, join the completed arch assembly to 

the side walls.

For permanent installations of the Arch Top Trellis, 

use the glue that is provided in the kit for top and side 

connectors.

1

2

3

4

5

6

Reviews: