background image

If you have any questions during the setup process, please call a SuperCloset representative at 1.877.476.9787

1.

 Locate your Yo-Yo light hangers (image a).

2.

 Loop the carabiner end over the top support of the tent and clip it to itself 

(image b). To adjust height, pull on the lose string to raise the Yo-Yo or 

press the button on the side of the Yo-Yo hanger to lower.

3.

 Unpack your T5 grow light(s).

    

4.

 Place the T5 Light(s) in the bottom of the tent. Lower the Yo-Yo system 

until you can connect the the Yo-Yos to the T5 hanging hardware. Raise 

the light to the desired height using the loose end of the Yo-Yo hanger 

cord.

5.

 Run the power cord from the light through the nearest electrical port hole.

Hanging your T5 Light

1. 

Locate the Thermometer/Hydrometer (image c). Remove the battery cover 

and remove the plastic safety blocker from the battery terminal. You can 

be creative on where you would like this placed inside the tent, but the 

easiest placement is inside the tool pouch on the inside of the tent.

2. 

Run the external probe to the outside of the tent, through the nearest 

ducting port. Make sure the probe is not touching any surface on the 

outside of the tent as this will provide false readings.  

3. 

Locate the Clip-On Active Air Fan (image d). Clip the fan to any one of the 

inside corner vertical poles.  The fan is designed to provide circulation and 

air movement.

Thermometer/Hydrometer/ICF

1. 

Locate the clone rack(s). Unbox, assemble and place in your Clone Room

Clone Rack

a

b

c

d

e

Summary of Contents for CloneRoom

Page 1: ...INSTRUCTION MANUAL CLONEROOM 2x4 5x5 ...

Page 2: ...up your CloneRoom Please read through the entire instruction manual before you begin including any and all instructions that come with the individual components Lets take a look at the layout and components of your CloneRoom GORILLA GROW TENT CARBON AIR FILTER T5 4 4 BULB GROW LIGHT INTERNAL CIRCULATION FAN 5 GALLON SOIL BUCKETS SUPERCLONER 50 TOOL POUCH 1FT EXTENSION CLONING RACK ...

Page 3: ...have planned accordingly to ensure you have the proper amount of power and properly sized breakers going to your CloneRoom Always consult a professional electrician when setting up and planning your electrical configuration Let s start with unpacking the CloneRoom Prior to setup make sure you have all of the necessary components by cross referencing the QAC Quality Assurance Checklist Take this ti...

Page 4: ...up instructions image a Determine ahead of time if you are able to assemble as a standard 6 11 tall tent or if you are able to maximize your space and go with the 7 11 tall configuration 2 Once your tent is assembled double check to make sure that all fittings are installed properly including your ceiling support poles image b We are now ready to set up the CloneRoom Gorilla Grow Tent set up Use m...

Page 5: ...curely image f 4 Position the carbon filter over the end of the inline fan and secure with included duct tape image g 5 Locate the ducting and hose clamp Slide the hose clamp over the end of the ducting and attach the ducting to the open end of the inline fan image h Tighten the hose clamp securely and feed the open end of the ducting through the desired ducting port image i Tighten the dual cinch...

Page 6: ...t 1 877 476 9787 The Inline Fan will be pulling air from inside the tent through the Carbon Filter ensuring that your exhaust is free of odors and aromas Carbon Filter Fan Diagram CARBON FILTER INLINE FAN DUCTING AIR FLOW AIR FLOW CARBON FILTER INLINE FAN DUCTING SET UP OPTION 1 SET UP OPTION 2 ...

Page 7: ...om the light through the nearest electrical port hole Hanging your T5 Light 1 Locate the Thermometer Hydrometer image c Remove the battery cover and remove the plastic safety blocker from the battery terminal You can be creative on where you would like this placed inside the tent but the easiest placement is inside the tool pouch on the inside of the tent 2 Run the external probe to the outside of...

Page 8: ...If you have any questions during the setup process please call a SuperCloset representative at 1 877 476 9787 CloneRoom Layout 2x4 Layout Top View 5x5 Layout Top View ...

Page 9: ... to the metal nodes on the front of the Air Pump Run the other end of the black tubing through the channels located on the rim of the reservoir image e 5 Connect the other end of the black tubing to the Air Stones Once these are connected ensure the Air Stones remain flat on the floor of the reservoir 6 Turn the black dial on top of your Air Pump clockwise until it stops Replace the lid of the Sup...

Page 10: ...INLINE FAN AIR PUMP AIR PUMPS T5 LIGHTS 1 Locate the power strip image a the GFCI Protector image b the Smart Plug s image c the 3 IN 1 adapter image d and the inline fan controller image e DO NOT PLUG IN THE POWER STRIP YET Use the below diagrams to plug in your components Properly configured Power Strip Should look like this Final Assembly 2x4 CloneRoom 5x5 CloneRoom a b c d e ...

Page 11: ...n on your CloneRoom Turn the power strip switch to the ON position and the system should spring to life before your very eyes 1 Light is properly hung 2 Reservoir is filled with water 3 Air Pump is next to NOT IN the reservoir 4 Light Power Cord is plugged into Smart Plug 5 Power Strip is off and plugged into the GFCI Protector Almost Done Your reservoir should always be filled at least halfway In...

Reviews: