WALIBI 3
| page 27
Harness User’s manual
| WALIBI 3
INSTALLING THE RESERVE PARACHUTE
Locking the reserve parachute container
13
Lower the upper flap and slide it into the lower flap.
Check the completed
installation during a
hang-test.
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to assure proper sys-
tem functionality.
Note :
Conducting and extraction test does not imply deploying the reserve
parachute which will stay inside its POD.
Mandatory extraction test procedure