8  Technical Parameters

8 Technical Parameters

Model

STH-4KTL-HT

STH-5KTL-HT

STH-6KTL-HT

PV Input

Max. Input Power (W) 

5,200 

6,500 

7,800 

Start-up Voltage (V)

150

150

180

Max. DC Input Voltage (V)

1,000

1,000

1,000

Rated DC Input Voltage (V)

620

620

620

MPPT Voltage Range (V)

150-850

150-850

200-850

No. of MPP Trackers

2

2

2

No. of PV Inputs 

1/1

1/1

1/1

Max. Input Current (A)

13/13

13/13

13/13

Max. Short-circuit Current (A)

18/18

18/18

18/18

Battery

Battery Type

Lithium Battery (with BMS)

Battery Communication Mode

CAN / RS485

Battery Voltage Range (V)

180-750

180-750

180-750

Max. Charge/Discharge Current (A)

25/25

25/25

25/25

Rated Current of Built-in Fuse (A)

63

63

63

Output (Grid)

Rated Output Power (kW)

4

5

6

Max. Output Power (kW)

4.4

5.5

6.6

Max. Apparent Power (kVA)

4.4

5.5

6.6

Max. Input Apparent Power (kVA)

8

10

12

Max. Charging Power of Battery (kW)

4

5

6

Rated Output Voltage (V)

3 / N / PE, 230 (400)

Rated AC Frequency (Hz)

50/60Hz  45-55Hz/55-65Hz

Max. Output Current (A)

6.7

8.3

10

Power Factor

0.8 leading …0.8 lagging

Max. Total Harmonic Distortion

<3% @Rated Output Power

DCI

<0.5%In

<0.5%In

<0.5%In

Output (Back-up)

UPS Switching Time

<10ms

<10ms

<10ms

Rated Output Voltage (V)

3/N/PE, 230 (400)

Rated AC Frequency (Hz)

50/60Hz  45-55Hz/55-65Hz

Max. Apparent Output Power (kVA)

4.4

5.5

6.6

Model

STH-4KTL-HT

STH-5KTL-HT

STH-6KTL-HT

Peak Overload Apparent Power (kVA)

8

, 60s

10

, 60s

12

, 60s

Single-phase Peak Output Power (kVA)

1.6

2.1

2.6

Voltage Harmonic Distortion

<3% @Linear Load

Efficiency

Max. Efficiency

98.1%

98.1%

98.1%

European Efficiency

97.3%

97.3%

97.3%

Max. Battery Charging Conversion Efficiency

97.2%

97.2%

97.2%    

Max. Battery Discharge Conversion Efficiency

97.2%

97.2%

97.2%    

Protection

DC Reverse Polarity Protection

Integrated

Battery Input Reverse Connection Protection

Integrated

Insulation Resistance Protection

Integrated

DC Switch

Optional

Surge Protection

Integrated

Over-temperature Protection

Integrated

Residual Current Protection

Integrated

Islanding Protection

Frequency  Shift, Integrated

AC Over-voltage Protection

Integrated

Overload Protection

Integrated

AC Short-circuit Protection

Integrated

General Data

Over Voltage Category

PV: Ⅱ;Main: Ⅲ

Dimensions (mm)

550W*410H*175D

Weight (kg)

26

26

28

Protection Degree

IP65

IP65

IP65

Self-consumption at Night (W)

<15

<15

<15

Topology

Transformer-less

Operating Temperature Range (° C)

-30~60

-30~60

-30~60

Relative Humidity

0~100%

0~100%

0~100%

Operating Altitude (m)

3000

3000

3000

Cooling

Natural Convection

Noise Level (dB)

<25

<25

<25

Display

OLED & LED

Communication

WiFi / LAN (Optional)

Compliance

IEC62109、IEC62116、VDE4105、VDE0126、AS4777、RD1699、

NBR16149、IEC61727、IEC60068、IEC61683、EN50549、EN61000

8  Technical Parameters

Summary of Contents for STH-10KTL-HT

Page 1: ...S U N W A Y S T E C H N O L O G I E S C O LT D H y b r i d I n v e r t e r STH 4 12KTL HT User Manual EN...

Page 2: ...stallation 22 4 1 Selection of Installation Location 22 4 2 Mounting the Inverter standard bracket 24 4 3 Mounting the Inverter Including bracket options 26 4 4 Electrical Connection 29 4 5 Communicat...

Page 3: ...not constitute any express or implied guarantee 1 Preface 1 Preface Attention 1 1 Overview This manual is an integral part of Sunways STH 4 12kW series three phase high voltage hybrid inverters herei...

Page 4: ...ot to undertake quality assurance in any of the following circumstances Damages caused by irregular transportation Damages caused by incorrect storage installation or use Damages caused by installatio...

Page 5: ...ve personal injury and equipment damage information 2 4 1 Symbol on the Hybrid Inverter Power indicator Grid status indicator Inverter status indicator Battery level indicator 2 4 2 Symbol on the Inve...

Page 6: ...H 8KTL HT STH 10KTL HT STH 12KTL HT 3 1 3 Applicable grid type The applicable grid types of the Sunways STH 4 12kW series are TN S TN C TN C S and TT When applied to the TT grid the voltage of N to PE...

Page 7: ...r will supply the loads first and second charge the battery and then feed to the grid You can set the power to the grid to 0W if the local grid doesn t allow When the PV power is insufficient the batt...

Page 8: ...nd then charge the battery if there s surplus Mode 5 Inverter will use power from PV and battery to supply loads in the predetermined period and the insufficient part will be supplied by the grid PV I...

Page 9: ...levels 3 2 Appearance Introduction Logo Display 550mm 410mm Figure 3 3 Front view 3 2 1 Inverter front view 410mm 175mm Name Plate 3 2 2 Inverter side view Figure 3 4 Side view Figure 3 5 Bottom view...

Page 10: ...cription 4 Alarm Indicator Off The inverter is running normally Slow flashing The monitoring device is not connected to the router or is not connected to the base station Quick flashing The monitoring...

Page 11: ...6 Inspection Report User Manual Quick Guide Monitoring Device Optional Back Up Terminal User Guide On Grid Terminal Expansion Bolt PV Terminal AC Cover Sunways Meter B with 3 CTs 1 Cord End Terminal 8...

Page 12: ...t direct exposure to sunlight and rain Install the inverter at the eye level for easy inspection of screen data and further main tenance The ambient temperature of the inverter installation location s...

Page 13: ...with 10mm diameter bit to drill 5 holes on the wall and make sure hole depth is 80mm Insert the expansion tubes into the holes and tighten them then fix the bracket onto the wall with expansion screw...

Page 14: ...shaped plate in the accessory bag then fix the L shaped plate to the mounting bracket Figure 4 10 Bracket assembly Use an electrical driller with 10mm diameter bit to drill 5 holes in the wall with 8...

Page 15: ...e Sunways has the right to refuse all damages caused by the mixed use of terminals Attention Moisture and dust can damage the inverter ensure the cable gland is securely tightened during installation...

Page 16: ...ply can be isolated or switched If you get Sunways meter A please refer to Figure 4 14A Figure 4 14A Standard wiring diagram PV Array Grid Normal Loads RCD RCD Back up Loads PV Array Communication Com...

Page 17: ...UP The additional grounding hole ON GRID PV1 Breaker E BAR N BAR Breaker RS485 2 1 L1 5 L1 S1 9 L3 S1 10 L3 S2 2 L2 6 L1 S2 3 L3 7 L2 S1 4 N 8 L2 S2 Breaker Main Switch Breaker Sunways CT CT 1 CT 2 CT...

Page 18: ...ing Figure 4 16 Grounding terminal connection Ground terminal connection steps The external grounding terminal is located in the lower right side of the inverter Fix the grounding terminal to the PE w...

Page 19: ...2 5 4mm2 7mm Cable type Conductor cross sectional area mm General photovoltaic cable Scope mm Recommended value mm 2 5 4 0 4 0 4 Product Installation Disassemble the connector in the accessory bag as...

Page 20: ...when making battery connection Disconnect the AC breaker on the grid side Disconnect the breaker on the battery side Turn the inverter DC switch to the OFF position Make sure the maximum input voltag...

Page 21: ...the inverter limitation and the polarity is correct Insert the positive and negative connector into the inverter battery terminals respec tively and a click sound represents the assembly in place as s...

Page 22: ...eve of AC cable for 40 60mm and peel off the sleeve in the conductor core of 3L PE N wires for 8mm as shown in Figure 4 27 Insert the stripped AC cables through the AC connector cover in the sequence...

Page 23: ...making the connection 4 Product Installation Figure 4 33 Figure 4 32 Lock the AC connector cover to the inverter with screws as shown in Figure 4 32 Screw up the rubber ring and anti water cap to make...

Page 24: ...be reliable otherwise the CT measurement accuracy may be af fected Note The rated current of CT in the inverter accessory box is 80A and the maximum allowed inserted cable diameter is 16mm If the max...

Page 25: ...Australia use One key to shut off PARCAN Parallel CAN communication bus interface EMS EMS power dispatching interface RLYOUT Dry contact output a group of normally open contact passive dry contact In...

Page 26: ...A 3M length battery communication cable is already attached to the inverter when you received it and you just need to insert it to the BMS interface of the inverter and battery Multiple inverters para...

Page 27: ...d Sunways doesn t provide the DRED device for the customer DRED connection uses the 6pin terminal on the left side and you can use the matching 6pin terminal in the accessory box to make the connectio...

Page 28: ...herwise please refer to the QUICK INSTALLATION GUIDE which is attached to the accessory bag 5 Start and Stop 5 Start and Stop 5 1 Start Inverter When starting the inverter follow these steps Turn the...

Page 29: ...l General Settings Advanced Settings WorkMode Set Battery_ID Set Setting Setting Main Window Wai ng Checking Normal Fault Info Main Window Wai ng Checking Normal Fault Info Main Window Wai ng Checking...

Page 30: ...e reasons OffGrid ReConn When the power grid is off the inverter can automatically restart the back up output after a fault or overloading protection occurred if the Off grid Restart is ON Otherwise t...

Page 31: ...Settings Short press 1s switch window Long press 3s enter the lower Menu No need to press just wait Test Pass Fail Auto Test CEI 0 21 Auto Test Record IPS Item Test Null Password 1111 Test Result Dis...

Page 32: ...ty company DCI Fault DC injection High Inverter de tects a higher DC component in AC output Restart the inverter Seek for help from the installer or manufacture Error Message Description Solution ISO...

Page 33: ...connect the AC DC cables Check whether the fan is blocked by foreign matters If not replace the fan Bus Voltage Hard Fault BUS voltage is over high Restart the inverter Seek for help from the installe...

Page 34: ...inlet and outlet if necessary Six months to a year it depends on the dust contents in air 7 2 Maintenance Danger Risk of inverter damage or personal injury due to incorrect service Always keep in mind...

Page 35: ...z Max Apparent Output Power kVA 4 4 5 5 6 6 Model STH 4KTL HT STH 5KTL HT STH 6KTL HT Peak Overload Apparent Power kVA 8 60s 10 60s 12 60s Single phase Peak Output Power kVA 1 6 2 1 2 6 Voltage Harmon...

Page 36: ...r kVA 8 8 11 13 2 Peak Overload Apparent Power kVA 16 60s 20 60s 20 60s Single phase Peak Output Power kVA 3 3 4 5 Voltage Harmonic Distortion 3 Linear Load 8 Technical Parameters Model STH 8KTL HT ST...

Page 37: ...S11 00019 01 No 1 Second Road Green Industrial Zone Chongshou Town Cixi City ZheJiang Province PRC www sunways tech com service sunways tech com...

Reviews: