6.2. Information for Commissioning the Inverter
After you have successfully powered up the inverter, it must be programmed and set up as per
the programming feature above.
Check each bond on
the solar panels
Check the VOC does
not exceed 480V
Ensure both MPPTs
are balanced
Measure the sup-
ply voltage check it
matches the settings
of the inverter
If it falls out of the set-
ting range it will cause
the inverse shut down
and alarm
See Grid Setup page
Check the battery
charge and discharge
is within the C rating
of the battery. Too
high will damage the
battery
Check the battery
BMS is communicat-
ing with the inverter
This is the heart of the
system this controller
everything
Ensure you are fa-
miliar with this, if you
fully understand the
controller you will fully
appreciate the capa-
bilities of there inverter
See section ‘Program
Charge / Discharge
Times’
This is for paralleling
systems, and wind
turbine
If paralleling inverters
in 3 Phase check you
phase rotation before
switching on the AC
Load, in 3 Phase the
output voltage will in-
crease across phase
to 400V
If using a wind turbine
please ensure you
have the correct limit-
ing resistor, caps and
rectifier
Familiarize yourself
with common fault
codes