![Sunstream BOAT LIFTS FL13018 Assembly And Installation Manual Download Page 31](http://html1.mh-extra.com/html/sunstream/boat-lifts-fl13018/boat-lifts-fl13018_assembly-and-installation-manual_1400537031.webp)
Recommended Battery’s.
Use two 12V group 27 marine deep-cycle battery with a minimum of 600
CCA (or with a reserve capacity of 160 Amp Hours)
.
Reserve capacity is the most important feature
.
Battery Capacity:
The FL13018 was tested to have an energy capacity of approximately 8 full cycles
at using a new battery with a reserve capacity of 160 Ah. However, try to not dip below 50% battery
capacity, since the solar panel would have difficulty in recovering from such a deep draw.
Solar Charging rate:
The following values are limits on full cycles (down and up) to keep battery
capacity at steady state condition. The capacity of the battery will allow for additional cycles for any
particular month. Table assumes all-day exposure with typical seasonal weather.
FORM NO.
PAGE 31 OF 33
REV.
690190
C-01
Summary of Contents for BOAT LIFTS FL13018
Page 7: ...3 2X 2X NUT 500 13 NYLOCK SS BOLT 500 13 X 2 75 HEX SS FORM NO PAGE 7 OF 33 REV 690190 C 01...
Page 8: ...4 2X NUT 500 13 NYLOCK SS 50 Ft lbs 68 N m FORM NO PAGE 8 OF 33 REV 690190 C 01...
Page 10: ...6 50 Ft lbs 68 N m 2X NUT 500 13 NYLOCK SS FORM NO PAGE 10 OF 33 REV 690190 C 01...
Page 15: ...2X 2X BOLT 375 16 X 3 00 HEX SS NUT 375 16 NYLOCK SS 10 FORM NO PAGE 15 OF 33 REV 690190 C 01...
Page 17: ...6X 11 FORM NO PAGE 17 OF 33 REV 690190 C 01...
Page 18: ...12 12X FORM NO PAGE 18 OF 33 REV 690190 C 01...
Page 19: ...13 FORM NO PAGE 19 OF 33 REV 690190 C 01...