![SunStar HC Series User Manual Download Page 11](http://html.mh-extra.com/html/sunstar/hc-series/hc-series_user-manual_1400295011.webp)
2-3) LEVELING THE MACHINE
The machine must be accurately leveled (especially front and back) to prevent the needle from moving out of
position.
1) Use the adjusting bolts installed at the four stands to level the machine (front, rear, left, and right). Use a level
gauge.
①
Check the voltage supply where the machine will be installed.
②
Install the cable away from the operator’s work space to prevent accident or injury.
③
If the difference in heights of the four bolts is over 10mm, place spacers beneath the lower supporting bolts
to make the heights even.
2) The machine must be horizontally balanced on all four sides - front, rear, right, and left.
[CAUTION]
The level gauge does not measure accurately on a square pipe or a table.
[Fig.2-2]
3) Using the level gauge
Use a nut to fully fasten the adjusting bolts when the machine is leveled.
[Fig.2-3]
[Fig.2-1]
Level gauge
Level gauge
Adjusting bolts
Level base