11
BATTERY INSTALLATION & REPLACEMENT
BATTERY INSTALLATION:
1. Take out 1 AA battery from manual bag.
2. Press the buckle of battery cover on the
Meter (No. 41)
, then remove battery cover.
3. Install 1 AA battery into the battery case on the back of the
Meter (No. 41)
. Pay attention to the
b and – poles before installing.
4. Press the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 41)
.
The installation is complete!
BATTERY REPLACEMENT:
1. Press the buckle of battery cover on the back of the
Meter (No. 41)
, then remove battery cover.
2. Remove the 1 old AA battery in the battery case and install 1 new AA battery into the battery case
on the back of the
Meter (No. 41)
. Pay attention to the b and – poles before installing.
3. Press the buckle of battery cover, then put the battery cover back to the back of the
Meter (No. 41)
.
The replacement is complete!
NOTE:
Dispose battery according to your state and regional guidelines.
Battery
Battery Cover
Summary of Contents for Row-N-Ride 077S
Page 40: ...39 ...