GD-1000 UL( US specification)
parallel connection
- 9 -
Power of
under dome
1. Parallel connecting of
heater panel B1, B2 and
Cs’ power cords (white).
2. Parallel connecting of
heater panel B1, B2 and
Cs’ power cords (red).
GD-1000 CE(European specification)
series connection
- 10 -
Power cords in the
upper dome
1. Installation of upper dome and under dome for GD-1000
CE(European specification) is the same as under UL(US
specification).(Please see page 5,7,8)
2. Please see the figure below for power cords in the upper and
lower dome under CE(European specification) for GD-1000.
Power cords in
the under dome
1. Series connecting of
heater panel A1 and A2
2. Weld the other end of
power cords of heater
panel A1 and A2 on the
outlet.
1. Series connecting of
heater panel B1 and B2s’
power cords.
2. Parallel connecting of
heater panel B1 and Cs’
power cords.
3. Parallel connecting of
heater panel B2 and Cs’
power cords.
B1 red power cord
B2 red power cord
B1 white power cord
B2 white power cord
C red power cord
C white power cord
A1 red
power cord
A2 white
power cord
A2 red
power cord
A1 white
power cord
B1 white
power cord
B2 red
power cord
B2 white
power cord
C white
power cord
B1 red
power cord
C red
power cord