4
·
Fig.1:
Assemble Long Mosquito Netting Runner 1&2 (E1&E2) together by Beam Connector
(G), Bolt (AA),
Flat Washer (BB). (Note: Assemble Short Mosquito Netting Runner 1&2 (F1&F2) as above same way.)
Fig.2:
Put Base (K) under Post (J), then use Bolt (AA) and Flat Washer (BB) to fasten.
Fig.3:
Put assembled Long Mosquito Netting Runner 1&2 (E1&E2) on Pole (J), then use Bolt (CC) and Flat Washer (BB) to
insert Bottom Connecting Oblique Beam (D) and lock on Pole (J). Don’t tighten the bolts at this step.
Fig.4:
Insert Short Mosquito Netting Runner 1&2 (F1&F2) into the gap between Pole (J) and Bottom Connecting
Oblique Beam (D), then use Bolt (CC) and Flat Washer (BB) to lock them tightly. Tighten the other side’s bolts also at
this step.
Fig.5:
Connect Pole Support Slice (I) to Post (J), Long Mosquito Netting Runner 1&2 (E1&E2), Short Mosquito Netting
Runner 1&2 (F1&F2) by Bolt (AA) and Flat Washer (BB).